Laserfiche WebLink
NMI NIIIITM1 <br />nonsissimmommorni <br />irrniornin nurrrirruiri <br />1111111111111 111111 11 I 1 !I 111111 111 <br />1111 1 11 1111 1111 1111111111 11 11111 1 <br />11111 1 111 1111 I 111 1111111111 1111111111 1 111 <br />Available options to meet water demand: <br />1. Conservation <br />2.Groundwater sources <br />3. Stormwater reuse <br />4.Surface water sources <br />5. Enhanced recharge <br />6. Reclaimed wasterwater <br />Municipal Water Use <br />Municipal water treatment: Iron removal, Organics removal, Fluoride (Z), Disinfection, Iron/Manga- <br />nese Sequestration <br />Rate structure: Increasing Block <br />2012 Permitted amount for municipal water supply (million gallons/year): 295 <br />18% <br />9% <br />Agricultural <br />Commercial ® Unaccounted <br />Historical municipal water use in the community <br />1.8 <br />1.6 <br />• 1.4 <br />0 1.2 <br />(73 <br />0 1 <br />0.8 <br />N • 0.6 <br />G) <br />To 0.4 <br />0.2 <br />0 <br />73% <br />Industrial ■ Residential <br />X00 c5A 0ti q^a 4 e") �.6 c'\ ��0 45 QUO Qin 01' CC) � Q4) 0° 0\ 00 OM Qr,,O Q^A Ogti <br />h n ti ti ti A �. ry R. 'L °L °L °L 'L 'L 'L 419' <br />WATER SUPPLY MASTER <br />PLAN- Draft June 2015 <br />• Average Monthly <br />• Max Monthly <br />• Min Monthly <br />WATER SUPPLY PROFILES <br />