Laserfiche WebLink
2. Mitigation Recommendations <br />Mitigation due to safety concerns includes the following: <br />Bunker Lake Boulevard (west of commercial section) <br />• Three lane section is recommended (two through lanes & a center two -way -left - <br />turn -lane) once the development is constructed. (short-term) <br />• Right turn lanes (locations and lengths) are to be dictated by development type. <br />(short-term) <br />Armstrong Boulevard & Alpine Drive <br />• Add northbound and southbound left turn lanes. (mid-term) <br />Alpine Drive & Puma Street <br />• Add westbound left turn lane. (mid-term) <br />• Add eastbound right turn lane. (mid-term) <br />Puma Street <br />• Three lane section is recommended (two through lanes & a center two -way -left - <br />turn -lane) once the development is constructed. (short-term) <br />• Right turn lanes (locations and lengths) are to be dictated by development type. <br />(short-term) <br />Prepared by: Bolton & Menk, Inc. — R16.109828 Existing Conditions <br />Future Business Park Page 10 <br />