Laserfiche WebLink
Figures 13 through 15 in Appendix A depict sanitary sewer and water main improvements. <br />Storm Water Management <br />Storm water management concepts were developed to maintain existing drainage patterns and <br />preserve the conveyance and flood storage capacity of the primary wetland corridor that bisects the <br />area. This will restrict development along the wetland corridor and retain the pre -development flood <br />capacity, thereby maintaining existing flow rates into the COR. <br />The study area can be segmented into three drainage districts, generally delineated by future land use. <br />Figure 16 in Appendix A displays the drainage area breakdown and a general regional pond layout. The <br />drainage area consists of a multi -use site (Area 1), residential area (Area 2), and commercial and <br />industrial sites (Area 3). The watersheds were modeled under future land use conditions to generally <br />size retention ponds to meet existing flow rates. The ponds were also located with respect to potential <br />storm sewer depths, reductions in wetland impacts, maximization of developable area and potential <br />aesthetic function. <br />The ponds depicted on Figure 16 in Appendix A depict areas that are best suited for regional rate control <br />basins only. Additional design parameters and regional storm water management planning should be <br />further refined as the areas begin to develop. <br />Cost estimates were not developed for the regional pond construction or internal site storm sewer <br />conveyance. It is anticipated that costs associated with pond construction will be completed by the <br />developer as a portion of the site grading. Also, it is assumed that internal site drainage will be <br />accommodated by dry swales and ditch systems to reduce storm sewer costs. <br />Street Lighting <br />Street lighting was included in the project costs to the level provided along Riverdale Drive, east of <br />Armstrong Boulevard. This includes both street level lighting and pedestrian lighting along the corridors. <br />Trails/Sidewalks <br />Existing trails were previously constructed along the north side of Bunker Lake Boulevard and the west <br />side of Puma Street. Project costs were prepared which include trails along the south side of Bunker <br />Lake Boulevard and the east side of Puma Street. <br />Phase Transitions <br />There is the potential for portions of the roadways to be constructed to wider sections than currently <br />exist. If this occurs, the new roadways will need to taper to meet the existing roadway widths. The <br />tapered sections will then be removed as the next phase of improvements is completed. Costs were <br />included in each phase for these tapering sections. <br />Right Turn Lane Additions <br />The roadways depicted in the exhibits depict through lanes and left turn lanes. Right turn lanes will be <br />required at each access off of Bunker Lake Boulevard and Puma Street. Individual access locations were <br />not considered in this study, and so the locations and lengths of right turn lanes were not considered at <br />Prepared by: Bolton & Menk, Inc. ADDITIONAL ANALYSIS <br />City of Ramsey — Future Business Park Page 9 <br />