Laserfiche WebLink
TABLE OF CONTENTS <br />Executive Summary <br />A. Short Term <br />B. Mid -Term <br />C. Long -Term <br />I. Introduction <br />II. Background <br />A. Proposed Development <br />Measures of Effectiveness <br />A. Level of Service and Delay <br />Existing Conditions <br />A. Data Collection <br />B. Operations <br />C. Safety <br />V. No -Build Conditions <br />A. 2040 No -Build Operations <br />B. No -Build Mitigation <br />VI. Build Conditions <br />A. Traffic Forecasts <br />B. 2040 Build Operations <br />C. Proposed Mitigation <br />D. Additional Operations Analysis (50% Development Completion) <br />Appendix A- TH 10 & Armstrong Boulevard Overpass Layout <br />Appendix B- Traffic Volumes <br />Appendix C- Crash Reports <br />Appendix D- Trip Generation For Future Business Park Development <br />Appendix E- Trip Generation For COR Development <br />Appendix F- Operations Analysis (Available Upon Request) <br />IV. <br />1 <br />1 <br />1 <br />2 <br />3 <br />3 <br />3 <br />4 <br />4 <br />5 <br />5 <br />8 <br />9 <br />11 <br />11 <br />14 <br />15 <br />15 <br />22 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />Prepared by: Bolton & Menk, Inc. — R16.109828 Table of Contents <br />Future Business Park <br />