future water treatment plant to be constructed in this area. For our analysis, we assumed a 16 -inch <br />water main would be constructed, with hydrants and service lines extended to the properties. <br />Figures 13 through 15 in Appendix A depict sanitary sewer and water main improvements. <br />Storm Water Management <br />Storm water management concepts were developed to maintain existing drainage patterns and <br />preserve the conveyance and flood storage capacity of the primary wetland corridor that bisects the <br />area. This will restrict development along the wetland corridor and retain the pre -development flood <br />capacity, thereby maintaining existing flow rates into the COR. <br />The study area can be segmented into three drainage districts, generally delineated by future land use. <br />Figure 16 in Appendix A displays the drainage area breakdown and a general regional pond layout. The <br />drainage area consists of a multi -use site (Area 1), residential area (Area 2), and commercial and <br />industrial sites (Area 3). The watersheds were modeled under future land use conditions to generally <br />size retention ponds to meet existing flow rates. The ponds were also located with respect to potential <br />storm sewer depths, reductions in wetland impacts, maximization of developable area and potential <br />aesthetic function. <br />The ponds depicted on Figure 16 in Appendix A depict areas that are best suited for regional rate control <br />basins only. Additional design parameters and regional storm water management planning should be <br />further refined as the areas begin to develop. <br />Cost estimates were not developed for the regional pond construction or internal site storm sewer <br />conveyance. It is anticipated that costs associated with pond construction will be completed by the <br />developer as a portion of the site grading. Also, it is assumed that internal site drainage will be <br />accommodated by dry swales and ditch systems to reduce storm sewer costs. <br />Street Lighting <br />The costs included for street lighting were derived from recent projects within the City of Ramsey and <br />are considered to be reasonable costs associated with providing street and pedestrian lighting along the <br />corridors. Costs include conduit, wiring and the actual light fixtures to be installed. The density of the <br />lighting fixtures is similar to the level provided along the recently constructed Riverdale Drive, east of <br />Armstrong Boulevard. Our understanding is the spacing may be increased (decreasing the number of <br />fixtures) for Phases 2 and 3. This may slightly reduce the costs associated with these phases. The costs <br />provided are considered conservative for that reason and may be reduced depending upon the types of <br />developments proposed. <br />Trails/Sidewalks <br />Existing trails were previously constructed along the north side of Bunker Lake Boulevard and the west <br />side of Puma Street. Project costs were prepared which include trails along the south side of Bunker <br />Lake Boulevard and the east side of Puma Street. <br />Prepared by: Bolton & Menk, Inc. ADDITIONAL ANALYSIS <br />City of Ramsey — Future Business Park Page 9 <br />