My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 06/16/2015
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2015
>
Minutes - Public Works Committee - 06/16/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:27:08 PM
Creation date
9/18/2015 3:46:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
06/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Motion carried. Voting Yes: Chairperson Riley, Councilmembers Johns and Kuzma. Voting <br /> No: None. <br /> 5. COMMITTEE BUSINESS <br /> 5.01: Consider Drainage Options for 173rd Avenue and Gibbon Street Area <br /> Civil Engineer II Linton reviewed the staff report and each of the options, noting that after the <br /> case was published, he realized it could be possible to create a cross section through the property <br /> as explained in Option 4. He said the wetland cannot be drained in an effort to make the water <br /> level lower than the home. He explained that while this may provide some relief, water seeks its <br /> own relief. The water, in this case, rose above the ground. <br /> Chairperson Riley asked why it would not work to dig a hole. <br /> Civil Engineer II Linton noted the natural level of the wetlands is expressed through the <br /> wetlands. If a hole was dug, the water level would be the same elevation as is expressed in the <br /> wetlands; it would not drop down. He stated it could provide more storage area. He related the <br /> action of the water and a hole to a cup and a serving bowl. Four inches of water in a little cup <br /> would fill it up, while the water level would be much lower in the serving bowl. The water is <br /> more spread out and shallow. <br /> Councilmember Shryock arrived at 6:05 p.m. <br /> Councilmember Johns inquired if the water will always be an issue in this area. <br /> Civil Engineer II Linton responded in the affirmative. <br /> Councilmember Johns asked how much water could be drained with piping added. <br /> Civil Engineer II Linton answered he could not be sure. The existing elevations will remain and <br /> make water drainage difficult. <br /> Chairperson Riley inquired whether the water table has risen over the course of time. <br /> Civil Engineer II Linton responded it has changed. <br /> City Engineer Westby noted the water level was very high in 2014. It does fluctuate. He said <br /> this issue will likely be a recurring problem without the pipe. He said the pipe may solve it and <br /> will at least provide relief. <br /> Civil Engineer II Linton stated if there is a heavy rain, the water could back up before it runs off. <br /> Councilmember Kuzma asked what the anticipated cost would be. <br /> Public Works Committee/June 16, 2015 <br /> Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.