Laserfiche WebLink
PSD - PARKVIEW EAST APARTMENTS - INFRASTRUCTURE ESTIMATE - PUBLIC <br />CITY OF RAMSEY, MN <br />BMI #R16.109475 <br />DATE: 9/17/2015 <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />QUANTITY <br />TOTAL <br />COST <br />PUBLIC IMPROVEMENTS - ROADWAY & SIDEWALK <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$10,000.00 <br />1 <br />$10,000.00 <br />2 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$2.00 <br />780 <br />$1,560.00 <br />3 <br />COMMON EXCAVATION <br />CU YD <br />$12.00 <br />1100 <br />$13,200.00 <br />4 <br />AGGREGATE BASE CLASS 5 (CV) <br />CU YD <br />$25.00 <br />600 <br />$15,000.00 <br />5 <br />TYPE SP 9.5 WEARING COURSE (2,B) (SPWEA240B) (2360) <br />TON <br />$75.00 <br />235 <br />$17,625.00 <br />6 <br />TYPE SP 12.5 NON-WEARING COURSE (2,B) (SPNWB230B) (2360) <br />TON <br />$70.00 <br />235 <br />$16,450.00 <br />7 <br />ADJUST VALVE BOX <br />EACH <br />$500.00 <br />1 <br />$500.00 <br />8 <br />5" CONCRETE WALK <br />SQ YD <br />$49.00 <br />750 <br />$36,750.00 <br />9 <br />CONCRETE CURB & GUTTER <br />LIN FT <br />$14.00 <br />1200 <br />$16,800.00 <br />10 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$1,000.00 <br />1 <br />$1,000.00 <br />11 <br />SIGNAGE <br />LUMP SUM <br />$2,500.00 <br />1 <br />$2,500.00 <br />12 <br />LANDSCAPE TREES <br />EACH <br />$600.00 <br />27 <br />$16,200.00 <br />13 <br />IRRIGATION SYSTEM <br />LUMP SUM <br />$10,000.00 <br />1 <br />$10,000.00 <br />14 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />$150.00 <br />25 <br />$3,750.00 <br />15 <br />DITCH CHECK TYPE BIOLOG <br />LIN FT <br />$4.00 <br />500 <br />$2,000.00 <br />16 <br />TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />EACH <br />$1,500.00 <br />2 <br />$3,000.00 <br />17 <br />SOD <br />SQ YD <br />$5.00 <br />2500 <br />$12,500.00 <br />TOTAL PUBLIC ROADWAY & SIDEWALK COST: <br />$178,835.00 <br />STORM SEWER <br />1 <br />24" RC PIPE SEWER DES 3006 CL III <br />LIN FT <br />$38.00 <br />56 <br />$2,128.00 <br />2 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$1,000.00 <br />1 <br />$1,000.00 <br />3 <br />CONSTRUCT DRAINAGE STRUCTURE 96" DESIGN 4022 <br />LIN FT <br />$850.00 <br />6.74 <br />$5,729.00 <br />4 <br />CASTING ASSEMBLY <br />EACH <br />$550.00 <br />1 <br />$550.00 <br />TOTAL STORM SEWER COST: <br />$9,407.00 <br />WATERMAIN & SANITARY SEWER - PUBLIC <br />1 <br />PIPE FITTINGS <br />POUND <br />$8.00 <br />350 <br />$2,800.00 <br />2 <br />6" GATE VALVE & BOX <br />EACH <br />$1,500.00 <br />1 <br />$1,500.00 <br />3 <br />8" GATE VALVE & BOX <br />EACH <br />$1,750.00 <br />4 <br />$7,000.00 <br />4 <br />CONNECT TO EXISTING WATER MAIN <br />EACH <br />$800.00 <br />2 <br />$1,600.00 <br />5 <br />HYDRANT <br />EACH <br />$4,000.00 <br />1 <br />$4,000.00 <br />6 <br />6" DIP CL 52 WATERMAIN <br />LIN FT <br />$28.00 <br />12 <br />$336.00 <br />7 <br />8" DIP CL 52 WATERMAIN <br />LIN FT <br />$32.00 <br />405 <br />$12,960.00 <br />8 <br />4" WATERMAIN INSULATION <br />SQ YD <br />$50.00 <br />10 <br />$500.00 <br />9 <br />CONNECT TO EXISTING SANITARY SEWER <br />EACH <br />$1,250.00 <br />1 <br />$1,250.00 <br />10 <br />8" PVC SANITARY SEWER SDR 26 <br />LIN FT <br />$40.00 <br />64 <br />$2,560.00 <br />11 <br />48" SANITARY MANHOLE <br />LIN FT <br />$350.00 <br />9.63 <br />$3,370.50 <br />12 <br />CASTING ASSEMBLY <br />EACH <br />$550.00 <br />1 <br />$550.00 <br />TOTAL WATERMAIN & SANITARY SEWER - PUBLIC COST: <br />$38,426.50 <br />TOTAL ESTIMATED CONSTRUCTION COST: <br />$226,668.50 <br />