Laserfiche WebLink
its citizenry and not to be punitive or to cause hardship to any individual, private or public company. When <br />considering the existing site, it does not consist of high quality natural areas (it did not even register on the Natural <br />Resources Inventory in 2007) nor does it include natural woodlands, which provide many of the desirable ecological <br />benefits such as wildlife habitat, reduced stormwater runoff (i.e. greater infiltration), reduced soil erosion, and <br />greenway corridors. Not only does the project propose more trees than would be required if the reforestation <br />standard did not exist, but it also enhances the community by providing additional transitional areas between <br />existing homes and the proposed development, both of which meet the spirit of the requirements. <br />This is the second time a proposed project has resulted in very large reforestation requirement (whether it is <br />accomplished through additional plantings or a financial payment). Exemptions were incorporated into the standard <br />to account for certain required improvements, such as stormwater ponds and trails, as well as provisions that would <br />exclude invasive species and/or diseased trees from the removal calculations,. Additionally, the required <br />landscaping within the applicable zoning district isalso eligible to help satisfy the reforestation standard. Even after <br />all these considerations, an additional eighty-nine (89) trees (at 2.5 inches) or $28,000.00 in restitution would be <br />needed. <br />The additional plantings on a project site of this size, or the financial payment to account for the restitution, appears <br />burdensome. Staff believes that a more reasonable application of the reforestation requirement would be to identify <br />the excess inches removed allow that to be reduced by the base landscaping requirements to determine the minimum <br />reforestation inches ([determine excess inches removed and multiply by 1.25] - base landscaping requirements per <br />the applicable zoning district = reforestation quantity in inches). Staff believes that this method is reasonable, <br />prudent and still meets the intent and purpose of the Tree Preservation Ordinance and will be applying this to <br />projects in the future. <br />Stormwater Management <br />The project proposes to utilize storm sewer infrastructure and ponding to address stormwater standards. It appears <br />that the proposed stormwater management efforts comply with the LRRWMO 3rd Generation Plan. <br />Alternatives: <br />Option #1: Recommend approval of the Landscape and Tree Preservation Plans contingent upon compliance with <br />the Staff Review Letter dated March 27, 2015. The Landscape Plan is generally acceptable with revisions outlined <br />in the Staff Review Letter. While a majority of the trees on site are proposed for removal, they are not part of a <br />natural woodland area nor are they considered to be a high quality natural area per the NRI. The reforestation plan <br />will result in larger trees installed initially, provides for transitional areas between the project and existing homes to <br />the north and west, and a greater quantity of trees replanted on the site than just the base landscaping requirement. <br />Staff believes the plans meet the purpose of the Tree Preservation Ordinance and supports this option. <br />Option #2: Recommend that the Tree Preservation Plan be revised to provide additional diameter inches of <br />reforestation trees and/or require a financial payment of $28,000.00 (224 inches x $125). Based on the lot sizes <br />(generally 1/4 acre or so), it may not be desirable to have eighty-nine (89) more trees installed (this number could <br />be even greater if the standard one [1] inch tree were installed) and a payment of $28,000.00 for tree removals <br />could be deemed punitive or burdensome. Staff believes that the proposed reforestation plan meets the intent and <br />spirit of the Tree Preservation Ordinance and does not support this option. <br />Funding Source: <br />All costs associated with this request are the responsibility of the Applicant. <br />Action: <br />Motion to recommend approval of the Landscape and Tree Preservation Plans contingent upon compliance with the <br />Staff Review Letter dated March 27, 2015. <br />