My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 03/30/2015 - Special
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2015
>
Agenda - Environmental Policy Board - 03/30/2015 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 12:01:09 PM
Creation date
10/15/2015 8:34:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Title
Special
Document Date
03/30/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: <br />Site Plan Review: Landscaping <br />Page 2 of 2 <br />should be provided a copy of the approved Landscape Plan and Planting Detail if they will be assuming <br />responsibility for installing the front yard trees on each lot. The following revisions are necessary: <br />• While it appears generally that each lot will have two (2) trees planted, many of them indicate that <br />one tree will be planted in the rear yard. Each lot shall have two (2) front yard trees. Please revise <br />the Landscape Plan accordingly. <br />• An alternative to Patmore Ash (Fraxinus pennsylvanica) shall be utilized due to the looming <br />emergence of Emerald Ash Borer and the potential that these trees may be planted within the public <br />road right of way becoming the City's responsibility for long term maintenance. <br />• The planting detail must be amended to include the following <br />o Planting depth shall be such that the Pt set of primary roots is at finished grade <br />o Only prune out dead/broken/deformed branches at time of installation <br />o Remove upper 1/3 of wire basket and burlap after being placed in planting hole <br />o 2-4 inches of wood chip mulch shall be included around all trees. Mulch shall not be <br />piled against the trunk of trees. <br />• Since required landscaping is proposed to help satisfy the reforestation requirement, all trees <br />planted shall be at least 2.5 inches in diameter, as that was the caliper used in the calculations. <br />• Boulevard area is required to be finished with sod. Remaining portions of lot can be finished <br />with sod, seed, hydroseed, or other acceptable ground cover. <br />Topsoil: Each individual lot will need to have four (4) inches of topsoil meeting the City's topsoil <br />specification. A topsoil inspection is required prior to landscaping being installed and copies of the load <br />tickets are required as well. This is reviewed at time of Building Permit Application and request for <br />Certificate of Occupancy for each individual lot. <br />Stormwater: The project is addressing stormwater management standards through the use of storm sewer <br />pipes and traditional ponding. While a complete review of the grading and drainage plans will be completed <br />by the Engineering Division, it should be noted that the contour labels on the small new pond in the <br />southeast corner of the site (adjacent to the existing pond) need to be revised. Presently, three (3) <br />consecutive contours are labeled as 882 and it appears they should be labeled as 882, 880, and 878. <br />
The URL can be used to link to this page
Your browser does not support the video tag.