My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 09/15/2015
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2010 - 2019
>
2015
>
Minutes - Public Works Committee - 09/15/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:28:07 PM
Creation date
10/29/2015 10:04:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
09/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Engineer Westby explained in this case, the swale would need to be filled in so the bottom <br /> is higher than what the lake level could ever reach to prevent wetland type vegetation from <br /> growing. The City does not have a vegetative maintenance program where staff would go clear <br /> vegetation. He said the City will maintain vegetation as needed when it interferes with <br /> operations, such as removing downed trees from drainage ditches. The City does not do work <br /> for aesthetic reasons, such as cleaning algae from ponds. <br /> Mr. Bergevin noted there has been a fairly dry period recently, and there is not quite as much <br /> water in the drainage ditch as there was in the last 24 months. <br /> Public Works Superintendent Riemer mentioned another resident has issues with standing water <br /> in the drainage easement on their property. This water has been in the yard for about two years. <br /> Since it was dryer this year, it has finally drained. <br /> Councilmember Johns noted the drainage easement is working as it should. She empathized <br /> with the property owners, but stated she was unsure how to share the cost when it is not part of <br /> the City's responsibility. <br /> Public Works Superintendent Riemer explained whatever is done to one side of the swale will <br /> affect the other side of it. <br /> Chairperson Riley inquired if it is staffs recommendation to look at the feasibility of putting in <br /> settling pond before conducting work. <br /> City Engineer Westby responded some calculations would need to be done to estimate costs, but <br /> in his opinion the benefit is solely for the property owners; it does not benefit the City. He said <br /> staff could go further with this and bring back estimated costs and the definition of a drainage <br /> easement if the Committee prefers. <br /> Mr. Bergevin commented it does not necessarily benefit them. It just gives them their property <br /> back. <br /> Councilmember Johns asked if the property owner is interested in sharing the cost. <br /> Mr. Bergevin replied he is not interested in sharing the cost. He noted there have been wetter <br /> years, such as 2005 and 2006, and there were no problems. He said his point was that something <br /> was working and it is no longer. He said the intention of the City was to have water flowing <br /> through that area, filtered and then drained into the wetland. The water table levels from 2006 <br /> and 2007 to now have changed only minimally. <br /> Councilmember Shryock stated she wanted to be cautious going down this route. She warned <br /> against setting a precedent. Some residents have had flooding of their homes, and some people <br /> on the river are seeing their property eroding. These are issues the homeowners must deal with <br /> because that's the nature of the property. In this case, if everything is still operable, and the <br /> water is staying within the 20-foot easement, then there is something causing this to happen that <br /> Public Works Committee/ September 15, 2015 <br /> Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.