My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 10/27/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:11:49 PM
Creation date
11/20/2015 1:59:31 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
670
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
foot above the mapped 100-year flood elevation. The finished fill elevation for structures <br />shall be no lower than the Regulatory Flood Protection Elevation and the fill shall extend <br />at such elevation at least fifteen (15) feet beyond the outside limits of the structure <br />erected thereon. <br />The area of a pond's HWL plus 1 foot of freeboard shall be contained entirely within an <br />outlot that is owned and maintained by the City. <br />The numerous natural depressions found throughout Ramsey have been incorporated into <br />the SWMP as ponding areas. Wetlands may be, and are currently being used for <br />stormwater storage for larger rainfall events. They may continue to be used for this <br />purpose — even after upstream development, provided that: <br />1. There is acceptable Best Management Practice pretreatment of the runoff in <br />accordance with the MPCA NPDES/SDS Construction Permit, Section <br />III.D., Permanent Stormwater Management System. <br />2. The bounce from the normal water level to the high water level does not <br />exceed two feet. <br />The effective use of ponding areas enables the installation of outflow sewers with <br />reduced capacities since the design storm duration is effectively increased over the total <br />time required to fill and empty the ponding reservoirs. Storm sewers represent a sizable <br />investment for the community and this investment can be more efficiently utilized by <br />ponding storm water in designated ponding areas and allowing smaller diameter pipes to <br />be used as outfall lines. <br />Equally as important as flood control and cost considerations, is the use of ponding areas <br />to: <br />1. Improve water quality; <br />2. Return storm water to the groundwater table; <br />For water quality ponds, the storage below the outlet is the most important consideration. <br />The area and depth of the ponds may differ from the values presented here, storage below <br />the outlet must be provided so that the prescribed pollutant loading of the system is not <br />exceeded. <br />The City will allow Developers to construct storm water ponds to serve a secondary <br />purpose as a development amenity. However, the Developer shall be required to enter <br />into a Development Agreement or Maintenance Agreement that outlines that the City will <br />not take on maintenance obligations beyond basic storm water functions. If constructed <br />as a water feature, the City will not guarantee water levels or water quality above basic <br />storm water requirements. <br />The wildlife aspects of the ponding areas shall be maximized in design and the proper <br />location of the trail system will allow good access to these areas for wildlife observation. <br />B. Model Results <br />Even numbered figures from Figure 10 through Figure 22 are maps of critical SSA pond <br />data superimposed on the most recent aerial photo of Ramsey. They are color coded to <br />highlight the 100-year storm conditions as follows: <br />Green — The pond functions properly and the peak elevation is fully <br />contained within the pond <br />Section X <br />October 21, 2015 Page 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.