My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 10/27/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:11:49 PM
Creation date
11/20/2015 1:59:31 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
670
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 19, 2015 <br />Mr. Bruce Westby <br />City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Rmsey, MN 55303 <br />engineering and environmental consultants BARR <br />resourceful. naturally. <br />Re: Local Surface Water Management Plan: City of Ramsey <br />Dear Mr. Westby: <br />The Lower Rum River Watershed Management Organization's (LRRWMO) Third Generation Watershed <br />Management Plan (LRRWMO WMP) was approved by the Board of Water and Soil Resources (BWSR) on <br />December 11, 2011. MN Rules 8410.016 requires that local municipal storm water plans shall be adopted <br />within 2 years of the BWSR boards approval of the last organization plan (Watershed District or Water <br />Management Organization) that affects local units of government. The city of Ramsey, lying totally within <br />the LRRWMO, has submitted their Local Surface Water Management Plan (Ramsey Plan) to the LRRWMO <br />on May 12, 2015J The Plan must, at a minimum, meet the requirements for local plans as outlined in <br />Minnesota Statutes 103B,235, except as provided by the LRRWMO WMP under Minnesota Rule <br />8410.0110, subpart 3. <br />Barr Engineering Co. (Barr) and the Anoka Conservation District (ACD) are reviewing the Ramsey Plan and <br />are submitting comments to the LRRWMO on compliance and conformance with the LRRWMO WMP_ <br />Barr's review and comments are primarily on the storm water management component of the Ramsey <br />Plan. The ACD's comments, submitted under separate cover, are on the goals and policies component of <br />the Ramsey Plan. State Statute requires the LRRWMO complete its review and provide comments by <br />July 11, 2015, 60 days of the submittal of the Ramsey Plan. E-mail correspondence from the City has <br />stated that the review period can be extended to July 16, 2015, the next regularly scheduled meeting of <br />the LRRWMO. <br />Review Comments of the Storm Water Management Plan <br />1. The storm water requirements (Appendix E of the LRRWMO WMP) of the LRRWMO need to be <br />stated in the Ramsey Plan and at a minimum adopted by the City. This includes rate control, <br />volume retention, water quality management, and flood contral/management. The LRRWMO <br />criteria are stated frequently throughout the text of the Ramsey Plan. However in addition, if in <br />one statement in one location within the Ramsey Plan it is stated that the City adopts/references <br />the requirements of Appendix E, this would provide greater clarity to the Ramsey Plan user of the <br />applicable storm water requirements. <br />Barr Engineering Co. 4700 West 77th Street, Suite 200, Minneapolis, MN 55435 952.832.2600 www.borr.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.