Laserfiche WebLink
Figure 6-9 of the TPP <br />Increased Revenue Scenario Transitways <br />Building an Accelerated Transitway Vision <br />Reference Items <br />Principal Arterial Highways <br />r• "�„-,. Other Trunk Highways <br />Lakes and Rivers <br />City Boundary <br />County Boundary <br />2940 Urban Service Area <br />MPO Area <br />JNorthstar Line <br />Blue Line <br />*No Green Line <br />Red Line <br />Orange Line <br />Gold Line <br />Penn A, <br />2 Chnegv: 6T ers1 <br />Frew leave <br />3,trOul <br />4 Nk= 1 <br />5Htiers e <br />Accelerated <br />Arterial BRT <br />Accelerated Transitways <br />under study <br />mode and alignment <br />not yet specified <br />Regional Multimodal Hub <br />Increased RY+:riuc: Scenario would <br />also include at least 1% average <br />annual bus expansion. <br />Page - 17 12015 SYSTEM STATEMENT — RAMSEY <br />TRANSPORTATION <br />