Laserfiche WebLink
Attachment #2 Listing of Minimum Threshold Goals Scoring <br />Goal 1: Answer <br />1) N/A <br />2) The apartment will be inviting as empty nesters downsize and want to live in a place <br />that has nice amenities, close to town and safe. Options for accessibillty are numerous <br />given the proximity to the light rail. <br />3) Young adults will be abFe to rent a piace while they are establishing their careers. The <br />trend is that young professionals do not dire to have the maintenance and upkeep of a <br />single family home. <br />4) N/A <br />5) N/A <br />6) Our offering will diversify the housing choices in this area; busy execu ves will indnur <br />amenities desirable wbile having access to the metro area. <br />Goal 2: <br />1) N/A <br />2) N/A <br />3) N/A <br />Goal 3: <br />Goal 4: <br />1) N/A 2) Our facility will transition the exterior aesthetics; there are townhomes to the north of <br />this site and mufti story commercial building to the south. We have incorporated <br />materials from both adjoining building type which biends the transition. <br />3) We have incorporated the foUowing latest building elements: Nichiha panels, non <br />building penetrating balconies with a girder system, cultured stone, shed roofs, and <br />dormers on the detached garages <br />1) When we planned a building on this site we considered the density, and best use of the <br />Pot. The building has numerousjogs and breaks to give some defin;ition. We are using <br />rnateriaLs that are maintenance free and energy efficient. LED Iighting, Very high <br />efficiency heating and cooling, ancl Iow-E glass throughout. <br />2) N/A <br />3) Elements of the storm water include BMP's and infrastructure that wilL settie out most <br />contaminants before it reached the City's storm system <br />4) The site utilizes both interior pathways and connections to the existing pathways <br />located in the COR <br />