Laserfiche WebLink
September 2, 2015 <br />City of Ramsey Council Members and Staff, <br />As you knowearlier this year PSD, LLC purchased approximately 14 acres from the City of Ramsey,of <br />whkh a portion of this lot would be platted to develop an apartment poject. The following |sa <br />summary of what has taken place, where we are today, and how the project will advance in the future. <br />Background information: <br />In 2014 PSD, LLC ("PSD") submitted a Purchase Agreement to the City of Ramsey ("the City") for the <br />purchase of Outlots A & B, RTC 11th Addition. At the time the PA was submitted, there were some <br />zoning issues. The City did not accept the PA and re-evaluated the zoning and FAR in certain areas of <br />the COR. The City worked through these zoriing issues and made some poicy changes earlier this year. <br />Prior to PSD submitting the original PA, PSD developed assumptions and commissioned a market study <br />for market rate apartments to verify that a new building could justify the need for market rate <br />apartrnents in this area. Upon buiding a Proforrna, which weighed heavily on the contractors and <br />architects estimated building costs, as well as, the need determined by the market study for the quantity <br />ard types af units, we proceeded wfth the project. At that time we met the minimum threshold return <br />rate of 7.5% which the bank ancl investors require. <br />Where We Are Today: <br />We have had major cost overruns in the project. The single Iargest overage is the actual bid for the <br />construction of the building. Since we closed on the ot this spring the actua bid riumbers are <br />significantly higher. During the bidding process we obtained multiple bids and selected the lowest <br />qualified bid. All bids that were submitted were quaUfied and comptete. As an act ofgood faith, the GC <br />we selected reduced their bid in order to close the gap of the unexpected costs. Currently the land is <br />tited to PSD, and PSD 15 prepping the lot for construction. Upori commencement of the construction of <br />this project, PSD will transfer the portion' of the lot to the ownership group that will construct the <br />complex. PSD will retain ownership of the balance of the raw land and will develop this raw land when <br />the market can Justity additional projects. The entfty that will own, construct and operate the building <br />will be Parkview East, LLC, which is comprised of muftipie investors. After running a cost analysis, the <br />project was approximately $1M over the anticipated budget. Through cost cutting measures, having <br />some items re'bid'having the GC reduce their overhead cost, and value engineering the shortfalt is now <br />slightly over S50Q/D0Q. <br />rsasupwoouDrive, Suite 315 <br />Ramsey, Mms5303 <br />Phone: (763) 427-5955 <br />Fax: (763) 427-4151 <br />=ww»,ma"mme"e/upme"tzorn <br />