Laserfiche WebLink
Bill Fossing <br />From: Elstrom, Perry <PEistrom@braunintertec.com> <br />Sent: Wednesday, August 05, 2015 8:40 AM <br />To: Bill Fossing <br />Subject: RM PF- Pkg Enclosure, Net Cost for Testing North CMU Wall <br />Attachments: GPR-)R CostEstimate.pdf <br />I planned to send you this yesterday afternoon but our servers crashed company wide and outlook was not available. <br />We are up and run ningtoday. <br />Attached is the cost estimate for the north cmu wall GPR/IR services. The actual T&M cost for those services was $1,611. <br />You requested we determine a net cost. Assuming the north wall would have required the same inspection effort as <br />performed for the south wall, we determined the following net cost.... <br />Non-destructive evaluation (field work), invoice #B034521= $1,461.00 'At <br />t.+' <br />Ikon -destructive evaluation report, invoice forthcoming = -450.0@- Of <br />Assumed cost of north wall special inspection -805.00 <br />Net cost =� $BB6 9� 656.&D <br />The assumed inspection cost of $805.00 was based on the following actual costs to complete the similar south wall <br />special inspections.... <br />8 hours inspection at $85/hr = $680.00 <br />1 trip at $70 = 70.00 <br />0.25 hours PA at $70 = 17.50 <br />0.25 hours PM at$150/hr= 37.50 <br />Total = $805.00 <br />Regards, <br />Braun Intertec <br />Perry Elstrom <br />612-369-3657 <br />pelstrom@braunintertec.com <br />1 <br />