Laserfiche WebLink
The original Contract Sum was $ 1,450,000 <br />Net change by previously authorized Change Orders $ 0.00 <br />The Contract Sure prior to this Change Order was $ 1,450,000 <br />The Contract Sura will be (increased)(dee-eased)(unrhange ) by this change. order in the $ 10,403 <br />amount of <br />The new Contract Sum including this Change Order will be $ 1,460,403 <br />The Contract time will be (+:urea i)( )(t)nchanged) by (0) days. <br />The date of Substantial Completion as of the date of this Change order therefore is: March 15, 2016 <br />NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price <br />which have been authorized by Construction Change Directive until the cost and time have been agreed upon by <br />both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change <br />Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER: <br />ARCHITECT <br />Boarman Kroos Vogel Group, Inc. <br />Address <br />222 N. 2nd Street_ <br />Minneapolis, MN 55401 <br />BY <br />Bruce Schwartzman <br />DATE <br />CONTRACTOR. <br />OWNER <br />Brennan} Construction of MN City of Ramsey <br />Address Address <br />124 East Walnut Strut, Suite 20 7550 Sunwood Chive <br />Mankato, MN 56001 Ramsey, MN 55303 <br />By BY <br />Ad/oww <br />Mark Landgaff Dean Kapler <br />DATE ;/'� DATE <br />AIA DOCUMENT G701 * CHANGE ORDER ` 2001 EDITION * AIA - COPYRIGHT 2001 <br />THE AMERICAN INSTITUTE OF ARCHITECT'S, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006-5292 <br />WARNING; Unlicensed photocopying violates U.S. copyright law and is subject to legal prosecution. This document was <br />electronically produced with permission of the AIA and cannot be reproduced without violation until the date of <br />expiration noted below. <br />$KV Group, Inc. <br />