My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/24/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 11/24/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:12:45 PM
Creation date
12/15/2015 2:14:06 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/24/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Scope of Services <br />Riverdale Drive Extension Project <br />City of Ramsey <br />November 17, 2015 <br />Location: The proposed 0.4 mile Riverdale Drive extension along the south side of T.H. 10 will connect Traprock <br />Street and Ramsey Boulevard and remove an existing uncontrolled access to TH 10 at Traprock Street. <br />The project will be constructed in right-of-way which will be acquired by the City through agreement with Anoka <br />County. Anoka County owns the Mississippi West Regional Park and will be a participant in the project planning <br />and design. <br />General Scope Description: Bolton & Menk will complete stakeholder engagement, surveying, preliminary <br />design, final design plans, project specifications, cost estimate and permits. <br />Bolton & Menk Proposed Team: <br />• Project Manager— Kevin Kielb, P.E. <br />• Design Engineer — Jason Cook, P.E. <br />• Water Resources—Tim Olson, P.E. <br />• Traffic Engineer— Bryan Nemeth, P.E., P.T.O. E. <br />• Resources — Chris Chromy and Eric Johnson were key parties in the T.H. 10 Corridor Study and will serve <br />as internal and external resources on an as -needed basis. <br />Key City Staff: <br />We anticipate assistance from several individuals at the City of Ramsey to lead to a successful project: <br />• City Project Manager — Bruce Westby, P.E <br />• Drainage, Permitting, Plan Review— Leonard Linton, P.E. <br />• Constructability Review and Utility Assistance — Mike McDowall <br />Schedule: The FY 2017 Municipal Agreement Funding (state funds) have been awarded to this project. <br />To meet the needs of the City and requirements for use of these state funds, this project will adhere to a <br />schedule that will include 2016 construction. <br />Detailed Scope Tasks: <br />Task 1: Project Management / Meetings <br />A. Coordination - Bolton & Menk will have ongoing coordination with the City's Project Manager. <br />Bolton & Menk will also coordinate with Anoka County and MnDOT staff as necessary. This task <br />includes coordinating with the City to gather base map data, complete the permitting process and <br />plan review. <br />Riverdale Drive Extension Project Page 1 of 5 November 17, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.