Laserfiche WebLink
V. Facility Comparisons <br />Public Works - Space Comparison <br />Red Wing <br />111110. M. Fit M-1.101411 R. <br />16,513 <br />41.19 <br />8.03 <br />57,310 <br />Willmar <br />19,680 <br />15.95 <br />16.96 <br />68,600 <br />Northfield <br />20,581 <br />8.61 <br />10.82 <br />52,400 <br />Golden Valley <br />20,845 <br />10.55 <br />1.68 <br />54,400 <br />Farmington <br />22,167 <br />14.94 <br />6.76 <br />44,970 <br />Crystal <br />22,588 <br />5.88 <br />5.30 <br />63,000 <br />Built in 2015, $12.8M <br />Elk River <br />23,447 <br />43.82 <br />17.47 <br />83,244 <br />Fleet 44,144 sf, Mechanics 13,300 sf, Shops 18,400 sf, Office 7,400 sf <br />Prior Lake <br />24,408 <br />18.33 <br />11.40 <br />48,453 <br />Chanhassen <br />24,432 <br />22.88 <br />7.52 <br />85,250 <br />White Bear Lake <br />24,555 <br />8.66 <br />4.23 <br />55,259 <br />Austin <br />24,763 <br />10.84 <br />14.04 <br />68,960 <br />Savage <br />28,639 <br />16.45 <br />14.51 <br />66,600 <br />29,000 sf addition in 2012 <br />Andover <br />31,709 <br />34.83 <br />14.99 <br />86,680 <br />Size reflects 2015 needs assessment, current size is 43,680 sf <br />Cottage Grove <br />35,339 <br />37.48 <br />11.27 <br />63,922 <br />Shakopee <br />39,167 <br />29.32 <br />12.52 <br />69,000 <br />Average <br />1 25,256 <br />1 21.32 <br />1 10.50 <br />1 64,537 <br />Ramsey (Existing) 24,935 29.79 7.74 32,000 <br />(Proposed GSF) 11.59 66,205 <br />General Notes: <br />1. Facility size does not include area for granular storage buildings. <br />END OF SECTION <br />V2 I Ramsey Public Works Study - Comm. No. 1937.02 B K V <br />DRAFT GROUP <br />