Laserfiche WebLink
Assistant Planner (Code Enforcement and Licensing) <br />ty each day rather than allowing entire programs fall from the work plan. These metrics may not always be the <br />0 <br />p <br />What's already not getting done that needs to be done (i.e. required under statute)? Additional resources must be allocated to these programs. <br />0 <br />0 <br />Pt5 <br />w <br />0 <br />a o <br />o <br />.4 -d <br />c <br />o <br />la <br />o B <br />. B <br />o ,do <br />42 <br />a <br />S 1-- <br />2 <br />x0 <br />E" a <br />o <br />p a a <br />s, ; 'b <br />0 <br />o <br />0 <br />al <br />a v' c, <br />E up 8 <br />w g °p.., <br />.3 w V4 .2 <br />0 , E <br />V �, • <br />o ti <br />00 :- <br />c4z p <br />'-'o' o <br />0 o <br />f'P-' a <br />0 <br />p v <br />. o <br />) Pi w <br />• • • • <br />