Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2016 tiro 2020 <br />Project # 11 -STM -003 <br />Project Name Whispering Pines Estates Plat 2 Storm Sewer <br />Type Improvement <br />Useful Life 50 Years <br />Category Storm Water Utility Improveme <br />Description <br />Department Stormwater Utility <br />Contact <br />Priority 6 -Planned <br />Status Active <br />Total Project Cost: $330,000 <br />Install storm sewer in Whispering Pines Estate Plat 2. The plat is located west of Armstrong Boulevard and south of Alpine Drive <br />Justification <br />The plat was developed with unpaved streets, ditches and driveway culverts. The project was subsequently paved. The ditches and driveway <br />culverts have sunken over time. This project would install storm sewer and address drainage throughout the plat. <br />Expenditures <br />2016 2017 2018 2019 2020 Total <br />Improvements Other than <br />Building Cost <br />330,000 330,000 <br />Total <br />Funding Sources <br />330,000 330,000 <br />2016 2017 2018 2019 2020 Total <br />Storm Water Utility Fund 330,000 330,000 <br />Total <br />330,000 330,000 <br />130 <br />