My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 11/24/2015
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2015
>
Agenda - Council Work Session - 11/24/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:12:56 PM
Creation date
12/15/2015 2:56:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
11/24/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2016 aim 2020 <br />Project # 15 -STM -002 <br />Project Name Reconstruction of Andrie <br />Street/164th Avenue <br />Type Improvement <br />Useful Life 50 Years <br />Category Storm Water Utility Improveme <br />Department Stormwater Utility <br />Contact <br />Priority 6 -Planned <br />Status Active <br />Description <br />Total Project Cost: $425,000 <br />ncludes reconstruction of Andrie Street and 164th Lane between Alpine Drive and Jarvis Street, including a 6 foot on -road bike lane. <br />Total Project Cost = $2,325,000 <br />Street Improvement: $2,325,000 <br />Storm Improvement: $425,000 *** <br />***NOTE: At time of CIP There is not enough funding for storm improvements in utility fund - may have to include cost in bonding <br />68 properties eligible for special assessments <br />Justification <br />hese streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be applied. <br />This project will install concrete curb and gutter and an on -street bike lane. Storm sewer will be added where necessary to protect the pavement. <br />The current roadway has standing water during certain seasons which weakens the pavement. <br />Expenditures <br />2016 2017 2018 2019 2020 Total <br />Improvements Other than 425,000 <br />Building Cost <br />425,000 <br />Total <br />425,000 <br />425,000 <br />Funding Sources 2016 2017 2018 2019 2020 Total <br />Storm Water Utility Fund 425,000 425,000 <br />Total 425,000 <br />425,000 <br />135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.