Laserfiche WebLink
These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be <br />tpplied. This project will install concrete curb and gutter and an on -street bike lane. Storm sewer will be added where necessary to protect the <br />)avement. The current roadway has standing water during certain seasons which weakens the pavement. <br />?5% Assessment <br />Capital Improvement Program <br />City of Ramsey, Minnesota <br />2016 aim 2020 <br />Project # 15-STR-002 <br />Project Name Andrie Street/164th Lane Reconstruction <br />Type Improvement <br />Useful Life 60 Years <br />Category Street Improvement <br />Description <br />Department Street Improvements <br />Contact <br />Priority 6 -Planned <br />Status Active <br />Total Project Cost: $2,325,000 <br />Includes reconstruction of Andrie Street and 164th Lane between Alpine Drive and Jarvis Street, including a 6 foot on -road bike lane. <br />Total Project Cost = $2,750,000 <br />Street Improvement: $2,325,000 <br />Storm Improvement: $425,000 <br />68 properties eligible for special assessments <br />Justification <br />Expenditures <br />2016 2017 2018 2019 2020 Total <br />Improvements Other than <br />Building Cost <br />2,325,000 2,325,000 <br />Funding Sources <br />Total 2,325,000 <br />2,325,000 <br />2016 2017 2018 2019 2020 Total <br />GO Bonding (Road Funding) <br />Special Assessment - Bonded <br />1,743,750 1,743,750 <br />581,250 581,250 <br />Total 2,325,000 <br />2,325,000 <br />158 <br />