My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 11/24/2015
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2015
>
Agenda - Council Work Session - 11/24/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:12:56 PM
Creation date
12/15/2015 2:56:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
11/24/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be <br />tpplied. This project will install concrete curb and gutter and an on -street bike lane. Storm sewer will be added where necessary to protect the <br />)avement. The current roadway has standing water during certain seasons which weakens the pavement. <br />?5% Assessment <br />Capital Improvement Program <br />City of Ramsey, Minnesota <br />2016 aim 2020 <br />Project # 15-STR-002 <br />Project Name Andrie Street/164th Lane Reconstruction <br />Type Improvement <br />Useful Life 60 Years <br />Category Street Improvement <br />Description <br />Department Street Improvements <br />Contact <br />Priority 6 -Planned <br />Status Active <br />Total Project Cost: $2,325,000 <br />Includes reconstruction of Andrie Street and 164th Lane between Alpine Drive and Jarvis Street, including a 6 foot on -road bike lane. <br />Total Project Cost = $2,750,000 <br />Street Improvement: $2,325,000 <br />Storm Improvement: $425,000 <br />68 properties eligible for special assessments <br />Justification <br />Expenditures <br />2016 2017 2018 2019 2020 Total <br />Improvements Other than <br />Building Cost <br />2,325,000 2,325,000 <br />Funding Sources <br />Total 2,325,000 <br />2,325,000 <br />2016 2017 2018 2019 2020 Total <br />GO Bonding (Road Funding) <br />Special Assessment - Bonded <br />1,743,750 1,743,750 <br />581,250 581,250 <br />Total 2,325,000 <br />2,325,000 <br />158 <br />
The URL can be used to link to this page
Your browser does not support the video tag.