Laserfiche WebLink
Category <br />Project# Priority 2016 2017 2018 2019 2020 Total <br />Street Light Utility Improvement <br />Priority D Street Lights <br />Riverdale Drive Extension Lighting <br />Street Light Utility Improvement Total <br />05-STLT-001 6 15,000 15,000 15,000 15,000 15,000 75,000 <br />16-STLT-001 6 275,000 275,000 <br />Water Utility Improvement <br />Complete Pump House 3 <br />The COR Bunker Lake Blvd (Armstrong - Ramsey Blvd) <br />Water Treatment Plant Construction <br />Watermain Looping: (Ramsey Blvd to Traprock St) <br />Well Rehabilitation & Pump Replacement <br />River Pines Lift Station Water Connection <br />Fire Station #1 Extension of Water <br />Watermain Sunfish Lk Blvd <br />REFURBISH WATER TOWER #2 <br />REFURBISH WATER TOWER #1 <br />BUNKER/PUMA WATER TRUNK EXT <br />Emergency Power Supply for Well #3 <br />Water Utility Improvement Total <br />GRAND TOTAL <br />04-WTR-005 <br />04-WTR-009 <br />04-WTR-017 <br />04-WTR-018 <br />07-WTR-001 <br />08-WTR-003 <br />11-WTR-003 <br />12-WTR-001 <br />14-WTR-001 <br />14-WTR-002 <br />14-WTR-003 <br />16-WTR-001 <br />15,000 290,000 15,000 15,000 15,000 350,000 <br />6 60,000 60,000 <br />6 340,000 340,000 <br />6 9,786,010 9,786,010 19,572,020 <br />6 185,000 185,000 <br />6 35,000 38,000 41,000 44,000 47,000 205,000 <br />6 20,000 20,000 <br />6 55,000 55,000 <br />6 450,000 450,000 <br />6 1,300,000 1,300,000 <br />6 1,300,000 1,300,000 <br />6 700,000 700,000 <br />6 115000 115,000 <br />150,000 2,223,000 1,796,000 9,830,010 10,303,010 24,302,020 <br />8,493,756 5,448,586 30,351,050 22,003,560 13,578,860 79,875,812 <br />18 <br />