|
Category
<br />Project# Priority 2016 2017 2018 2019 2020 Total
<br />Street Light Utility Improvement
<br />Priority D Street Lights
<br />Riverdale Drive Extension Lighting
<br />Street Light Utility Improvement Total
<br />05-STLT-001 6 15,000 15,000 15,000 15,000 15,000 75,000
<br />16-STLT-001 6 275,000 275,000
<br />Water Utility Improvement
<br />Complete Pump House 3
<br />The COR Bunker Lake Blvd (Armstrong - Ramsey Blvd)
<br />Water Treatment Plant Construction
<br />Watermain Looping: (Ramsey Blvd to Traprock St)
<br />Well Rehabilitation & Pump Replacement
<br />River Pines Lift Station Water Connection
<br />Fire Station #1 Extension of Water
<br />Watermain Sunfish Lk Blvd
<br />REFURBISH WATER TOWER #2
<br />REFURBISH WATER TOWER #1
<br />BUNKER/PUMA WATER TRUNK EXT
<br />Emergency Power Supply for Well #3
<br />Water Utility Improvement Total
<br />GRAND TOTAL
<br />04-WTR-005
<br />04-WTR-009
<br />04-WTR-017
<br />04-WTR-018
<br />07-WTR-001
<br />08-WTR-003
<br />11-WTR-003
<br />12-WTR-001
<br />14-WTR-001
<br />14-WTR-002
<br />14-WTR-003
<br />16-WTR-001
<br />15,000 290,000 15,000 15,000 15,000 350,000
<br />6 60,000 60,000
<br />6 340,000 340,000
<br />6 9,786,010 9,786,010 19,572,020
<br />6 185,000 185,000
<br />6 35,000 38,000 41,000 44,000 47,000 205,000
<br />6 20,000 20,000
<br />6 55,000 55,000
<br />6 450,000 450,000
<br />6 1,300,000 1,300,000
<br />6 1,300,000 1,300,000
<br />6 700,000 700,000
<br />6 115000 115,000
<br />150,000 2,223,000 1,796,000 9,830,010 10,303,010 24,302,020
<br />8,493,756 5,448,586 30,351,050 22,003,560 13,578,860 79,875,812
<br />18
<br />
|