My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/08/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 12/08/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:13:07 PM
Creation date
12/15/2015 3:20:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/08/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey Pu <br />wmseblic Works <br />ors <br />ampus <br />PROCESS/PROJECT OUTLINE <br />Estimated Cost: $13Nl'$I5x4 (I1/12/201S) <br />1. Space Needs Analysis 2016 <br />The purpose of this step is to answer a number of questions regarding the existing Public Works site. For example, how <br />are we operatu)g today; and what resources do we have today? What resources/ facWtes do we need now and n the <br />future? Can we renovate the xstng Pubhc Works campus/ budngs? Should wedemolish and rebuild? What <br />alternatives for location and design of a new campus exist; and how much do they cost? Constructon ora new Pubic <br />Works campus will result in available land for redevelopment—what is the highest and best use for redevelopment? <br />DELIVERABLES: <br />--Feasibility Report <br />--Space Needs An-3ysis <br />--Master Planning <br />2. Preliminary Design <br />2017 $65,000 <br />The purpose of this stage is to develop schematic designs of the new Public Works Campus; and to select a design. The <br />outcome of ths stage is preliminary architectural designs, preliminary site plan documents, preliminary. project budget, <br />and overall project design selected. <br />DELIVERABLES: <br />--Genera BuHding Desgr and Layout Selected <br />—Pne!\m}naryDetailed Budget, Architectural Plans, and Site Plans <br />3. Final Design, Specs, Bid Docs 2017/2018 $190,000 <br />The purpose of this stage is to develop final detailed site plans, architectural plans, civil plans, landscaping plans, <br />electric/ mechanical plans, construction specifications, bid documents, and project budget. This work does have ashelf <br />life offive years. This is work will need to be completed in order to construct a new Public Works Campus. Essentially, <br />the project would be ready -to -bid after this step. <br />DELIVERABLES: <br />-Fina deted pans specfictions, bd documents, and budget <br />--Project wouid he ready to bid <br />4. Bidding & Bid Award 2018/2019 $15,000 <br />The purpose of this stage is to bid and potentialiy award the proposed construction project to a general <br />contractor. Staff would recommend the City Council have a detailed/formal policy discussion regarding this project <br />before this step iscompleted. This wcud enta a detaIed review ofthe project budget and the proposed <br />funding source (bonding). The outcome of said discussion would be consensus support from policy makers for <br />construction of a new Pubc Works Campus, or not. <br />DEUVERADiE3: <br />—BidTabulation and Potential Bid Award <br />5. Construction Administration 2019/2020 <br />The purpose of this stage is to physically. construct a new Public Works and provide construction administration <br />services. This step would heauthorized when abid isawarded, The nurnber above ony outnes the cost for the <br />architect to provide construction administration services (project management). <br />DiSCLAIMER: other than step 1, a!! numbers included this document are very preliminary, in draft form, unofficial, and not developed by licensed <br />professionals. As this process unfolds, accurate numbers will be provided. These numbers should be utilized for reference purposes only. <br />
The URL can be used to link to this page
Your browser does not support the video tag.