My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 06/04/2015
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2015
>
Agenda - Planning Commission - 06/04/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:23:11 AM
Creation date
12/16/2015 10:28:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
06/04/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />rate/volume of runoff must not exceed the pre -developed rate/volume of runoff <br />for the 10 -year, 24 hour storm., utilizing the "SCS Method" with a curve number <br />determined using Group C soils as a minimum. <br />A permit for work within the County Right -of -Way is required and must be <br />obtained prior to the commencement of any construction. Contact Roger Butler, <br />Traffic Engineering Coordinator for this department, for further information <br />regarding the permit process. <br />It should be noted that residential land use adjacent to highways will usually <br />result in complaints regarding traffic noise. Traffic noise at this location <br />could exceed Noise Standards established by the US Department of Housing and <br />Urban Development and the Minnesota Pollution Control Agenccyy. Anoka County <br />policy regarding new developments adjacent to existing County Highways prohibits <br />the expenditure of highway funds for noise mitigation measures. The City and/or <br />the <br />Developer should assess the noise situation and take any action deemed <br />necessary to minimize associated impacts at this site from any traffic noise. <br />Thank you for the opportunity to comment. Please keep this department informed as plans <br />for this site are developed further. The City or the Developer should contact me when <br />construction of the new city streets are near completion, sot that stop sign installations at <br />CR 56 and CR 116 can be coordinated by this department. Feel free to contact me if you <br />have any questions. <br />S' :WereIy,; <br />ane Pembe <br />Traffic Engineer <br />xc: Roger Butler, Traffic Engineering Coordinator <br />xc: Skip Anderson, County Surveyor <br />Sylvia Frolik, City of Ramsey <br />46- <br />dmh/1RAMBLVD <br />
The URL can be used to link to this page
Your browser does not support the video tag.