My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 09/10/2015
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2015
>
Agenda - Planning Commission - 09/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:23:39 AM
Creation date
12/16/2015 10:48:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
09/10/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey 2030 Comprehensive Plan <br />Chapter 6: Transportation <br />3. 2030 Traffic Forecasts <br />Significant development is expected in Ramsey over the next 22 years. The 2030 <br />housing, population, and employment forecasts show significant growth from 2008 to <br />2030. These increases are expected to have substantial impacts on the transportation <br />system. The Anoka County travel forecast model was used to prepare the 2030 traffic <br />forecasts, however, the model was modified to account for the proposed growth and <br />projected future roadway improvements during this time period. <br />At the request of the Metropolitan Council, traffic forecasts for the 2030 roadway <br />system with a new Mississippi River bridge were also prepared. These were using the <br />revised 2030 Anoka County forecasts and then adjusted to account for the roadway <br />alternative. A second set of 2030 forecasts are included for reference purposes only <br />and are based on the bridge location as proposed by Anoka County. <br />The City is currently divided up into 10 Traffic Analysis Zones as illustrated on <br />Figure 6-3. These zones, known as TAZs, are used to establish an understanding of <br />the number of trips that are generated from a particular area and would use the <br />roadway system. Table 6-1 represents household and employment projections for the <br />10 TAZs in Ramsey for 2030. These projections were based on a draft of the plan that <br />was brought before the Planning Commission and City Council in November of 2008, <br />which was based on the preferred plan developed by community members in October <br />2008. The totals from that plan have been adjusted slightly to match other projections <br />in this plan agreed to by Met Council. At the public hearing for the plan before the <br />Planning Commission, a small number of lots were added to the MUSA at the request <br />of those specific property owners. While the units that may occur on these lots are not <br />included in the following TAZs, their impact should be negligible. <br />Figure 6-3 Traffic Analysis Zones (TAZ) <br />City of Ramsey 2030 Comprehensive Plan <br />Pg. 6-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.