Laserfiche WebLink
City of Ramsey 2030 Comprehensive Plan <br />Chapter 6: Transportation <br />The resultant 2030 average annual daily traffic forecasts (AADT) developed for principal <br />arterials, minor arterials, and collectors in Ramsey are shown in Table 6-2. <br />Table 6-2 Existing and Future Traffic Volumes <br />Location <br />Existing <br />2030 <br />Forecasts <br />with River <br />Crossing <br />2030 Forecasts <br />without River <br />Crossing <br />CSAH 83 s/o CSAH 22 <br />4,200 <br />10,000 <br />10,700 <br />CSAH 83 11/0 Alpine <br />4,800 <br />17,400 <br />18,700 <br />CR 63/175th w/o CSAH 5 <br />1,000 <br />5,200 <br />3,400 <br />CR 63/Green Valley** e/o <br />CSAH 5 <br />2,000 <br />10,100 <br />13,600 <br />CR 27/179th** e/o TH 47 <br />1,900 <br />3,800 <br />3,800 <br />TH 47 n/o CR 27 <br />6,900 <br />15,100 <br />15,100 <br />TH 47 n/o CSAH 5 <br />14,800 <br />14,600 <br />14,800 <br />TH 47 n/o CSAH 116 <br />22,200 <br />22,800 <br />23,500 <br />CSAH 5 n/o 167th <br />5,900 <br />9,100 <br />10,900 <br />CSAH 5** e/o CSAH 56 <br />5,500 <br />12,000 <br />12,100 <br />CSAH 5** s/o Alpine <br />5,200 <br />11,600 <br />12,400 <br />CSAH 56 n/o 149th <br />6,000 <br />15,200 <br />16,300 <br />CSAH 56 n/o Sunwood <br />6,400 <br />23,400 <br />18,500 <br />US 10/169 e/o CSAH 56 <br />40,500 <br />47,500 <br />51,800 <br />CSAH 57 n/o Alpine <br />1,900 <br />4,900 <br />4,600 <br />CSAH 57 n/o US 10 <br />9,100 <br />18,700 <br />22,200 <br />CSAH 116 e/o CSAH 56 <br />2,900 <br />22,900 <br />22,100 <br />CSAH 116 e/o CSAH 57 <br />8,100 <br />24,600 <br />23,600 <br />US 10 w/o CSAH 83 <br />36,000 <br />43,200 <br />44,800 <br />US 10 e/o CSAH 83 <br />39,000 <br />40,400 <br />47,700 <br />Future Bridge* <br />NA <br />23,700 <br />NA <br />* Traffic forecasts for river crossing are based on potential crossing <br />Source: Anoka County 2030 model adjusted to account for updated city land uses by Iteris, <br />Inc. Anoka County travel forecast model adjusted for assumed changes in road network for <br />the river crossing scenario only. <br />* * On candidate road segments proposed to be turned back from Anoka County to the City <br />before 2030 <br />4. Adequacy of Roadway System in Year 2030 <br />To determine whether the arterials of the 2030 roadway system will adequately <br />accommodate the traffic volumes forecast for 2030, a comparison between the <br />City of Ramsey 2030 Comprehensive Plan Pg. 6-14 <br />