My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 12/03/2015
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2015
>
Agenda - Planning Commission - 12/03/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:24:01 AM
Creation date
12/16/2015 11:09:00 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
12/03/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) Where excavations are made within 30 feet of a public roadway or other right-of-way, the <br />permittee shall erect either a suitable guard rail along said right-of-way or roadway or construct a <br />dirt berm not less than 30 inches in height and six feet in width at the base. <br />(4) All reasonable means shall be employed by applicant to reduce dust, noise and nuisances. <br />(5) Noise. The maximum noise level at the perimeter of the work site shall be within the limits set by <br />the Minnesota Pollution Control Agency and the Environmental Protection Agency of the United <br />States. <br />(6) Hours. All mining operations shall be conducted between 7:00 a.m. and 8:00 p.m. on weekdays <br />only unless otherwise specifically approved by the city engineer or their agent. <br />Explosives. The use and handling of explosives shall be coordinated with the city police <br />department. Blasting shall occur only at hours specified by the police department and at no other <br />time. <br />(7) <br />(8) Dust. Operators shall utilize all practical means to reduce the amount of dust caused by the <br />operation. In no case shall the amount of dust or other particulate matter exceed the standards <br />established by the MPCA. No operations shall be allowed when wind gusts exceed 30 miles per <br />hour. <br />(9) <br />Water pollution. Operators shall comply with all applicable Minnesota Pollution Control Agency <br />regulations and federal and Environmental Protection Agency regulations for the protection of <br />water quality. No waste products or process residue, including untreated washwater, shall be <br />deposited in any lake, or natural drainage system, except that lakes or ponds wholly contained <br />within the extraction site may be so utilized. <br />(10) Top soil preservation. All top soil shall be retained at the work site until complete rehabilitation of <br />the work site has taken place according to the rehabilitation plan. <br />(11) Designated haul routes shall be maintained by the operator in accordance with state department <br />of transportation's Specification 2051.4 as found in the state department of transportation <br />Standard Specifications for Construction, 1983 Edition. <br />Dangerous operations. The operators shall change, alter or modify immediately any excavation or <br />operation therein deemed by the council to be unsanitary or dangerous or polluted or contrary to the <br />general health and welfare of the community. <br />Designation of haul roads and traffic law compliance. Material of the kinds and for the purposes <br />described herein shall not be hauled from any source until the haul road from that source has been <br />officially designated as a haul road and all materials hauled from the source shall be hauled over that <br />road. <br />(1) The operator shall select a haul road over which it is proposed to haul the materials, as previously <br />described, and notify the city engineer as to the road so selected. Within 15 calendar days after <br />being notified of the haul road selection, the city engineer will, if the road so selected is a <br />practicable route, approve that road as a designated haul road. <br />(2) After a haul road has been officially designated, the operator may select a different road for official <br />designation under the same conditions as previously stated. However, any changes made in haul <br />road designation shall not relieve the operator of their obligation of restoring the previously <br />designated haul road if any of the above-described materials were hauled over that road. <br />While hauling operations are in progress, the operator shall maintain the haul road in a condition <br />satisfactory to the city engineer. This work shall include application of water, bituminous material, <br />or calcium chloride to the road surface as may be necessary to alleviate dust nuisance and <br />eliminate traffic hazards. This work shall also include the removal of spillage of any material on <br />the haul road. <br />(3) <br />(4) When hauling operations over any haul road are completed, the operator shall (at their option): <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.