My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/20/2015
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2015
>
Agenda - Public Works Committee - 10/20/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:46:23 AM
Creation date
12/16/2015 11:30:07 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/20/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember Shryock inquired whether there is a master trail map and if the GPS can help <br />create that. <br />City Engineer Westby confirmed there is a master trail map, and the GPS will help staff to <br />update it. <br />City Engineer Westby gave an update on the following items: <br />Properties flooded in the spring: These cases will be brought to Council, possibly in November. <br />He noted staff has a heavy workload with the assessment hearings coming up. However, the <br />feasibility reports and costs for a possible solution are still being considered. The property <br />owners have been updated with the progress of these cases. <br />Garnet Street: The project is waiting for the curb contractor to place the curb. The road is <br />passable, even after rain. The hardest part of this project has been completed. This is anticipated <br />to be complete in October. <br />Jarvis Street: The curb was finished earlier in the day. There have not been any calls on this <br />project, other than irrigation system damages. Staff will work with residents to repair irrigation <br />systems at the end of this project. <br />Ridgepoint: Old construction materials such as wood, tires and concrete have been found at the <br />site. The project has been shut down, and the contractor is estimating costs to haul and dispose <br />of these materials. The contractor hired a testing firm to test the materials. There is no known <br />hazardous waste; it is only construction material. Staff plans to meet with Village Bank in the <br />morning to learn more about the project status. <br />Armstrong Interchange: This should be substantially complete at the end of October or possibly <br />the beginning of November. <br />Chairperson Riley asked about the cataloging of trails that are ADA. He said he understood <br />unless something is changed or reconstructed, the trails can stay as they are. <br />City Engineer Westby responded this is unclear with Mn/DOT. He said he has conflicting <br />documentation from Mn/DOT on this. He stated this will have to be clarified before the Trail <br />Maintenance Policy is completed. <br />Chairperson Riley noted he has had many residents ask for the installation of flashing yellow <br />arrows. <br />City Engineer Westby explained Anoka County owns most of the signal lights in Ramsey. They <br />are developing a priory plan to determine which intersections need flashing yellow arrows. He <br />said Anoka County is installing all new systems to be ready for installation of FYAs, but older <br />systems will need to be retrofitted. He said it is a funding issue for them. He acknowledged <br />there have been a lot of calls and requests for them. <br />Public Works Committee / September 15, 2015 <br />Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.