My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council Work Session - 11/10/2015 - Special
Ramsey
>
Public
>
Minutes
>
Council Work Session
>
2015
>
Minutes - Council Work Session - 11/10/2015 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 3:15:12 PM
Creation date
12/16/2015 3:07:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council Work Session
Document Title
Special
Document Date
11/10/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of putting one ton of material in place about $1,000 and it takes about 3 tons to cover up one foot of <br />riverbank". <br />"Regarding the power plants. There are actually two of them upstream from us, one nuclear plant at <br />Monticello and one coal plant at Becker. Both put out cooling water discharge into the river. Several years <br />ago the Monticello plant was shut down for maintenance, during the winter of that year the river froze <br />over as it had done in years past and a "normal" ice out occurred that spring. The Becker plant was in full <br />operation during this time. This would seem to indicate that the river can handle the discharge from one <br />power plant but not two". <br />And <br />"Just one more clarification. The rock ridge that is approximately 1/3 mile downstream from me is <br />also the approximate same location for an underwater power cable crossing. The possibility exists that the <br />rock ridge was put there to protect the power line. This would mean that our flooding problem is in part <br />man made but completely out of our control". <br />
The URL can be used to link to this page
Your browser does not support the video tag.