My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/11/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 01/11/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:56:30 PM
Creation date
1/15/2016 12:24:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/11/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO 1 <br />Date: January 6, 2015 <br />Project: Center Street <br />Contractor: Douglas -Kerr Underground, LLC <br />Award Date: September. 9, 2014 <br />Contract Modifications: <br />Revise contract to include insulation of watermain in locations with less than 7.5 feet of <br />cover to prevent freezing. Revise configuration of outlet for stormwater treatment <br />structure to allow for transition in pipe material to occur within a sump manhole for <br />additional stormwater treatment. <br />Cost of Change: <br />Insulation of Watermain $ 5,925.03 <br />10 LF of 24 " x 35 " ALCMP $ 1,032i 00 <br />Construct Drainage Structure Design 60-4020 $ 3,192.80 <br />Delete 10 LF of 36" Span RC Pipe Arch Sewer Class 111 ($ 727.50) <br />Original Contract Price: $483,331.31 <br />Previous Change Orders: $ 0.00 <br />Change in Contract Price due this. Change Order: $ 9,422.33 <br />Total Contract Price including this Change Orders: $492,753.64 <br />This document will become a supplement to the contract and all provisions will apply <br />hereto. <br />Recommended: <br />Approved by: <br />Accepted: <br />Engineer <br />City Administrator <br />Contractor <br />CHANGE IN CONTRACT TIME <br />Due to this change, the Contract Time: <br />❑ is Increased by ❑ _ Working Days <br />❑ is Decreased by ❑ - Calendar Days <br />® is not changed. <br />❑ May be revised if the work affected the controlling <br />operation. <br />Larc <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.