My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/11/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 01/11/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:56:30 PM
Creation date
1/15/2016 12:24:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/11/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Code Section 117-359 (Grading, Mining and Filling Permits) currently regulates grading, mining, and filling <br />by requiring an IUP for any property where these activities will occur. The IUP requirement is intended to regulate <br />mining activities and there are several exceptions to the IUP requirement outlined in Section 117-359 (c). Those <br />exceptions are as follows: <br />1. Grading can occur without additional permits as part of an approved grading plan in a subdivision plat, site <br />plan, or planned unit development. <br />2. Grading is permissible in any situation where a public agency needs to move soil, rock, or other natural <br />materials as part of construction or maintenance of streets and utilities. <br />3. Grading is also allowed without an IUP on individual residential lots as long as it is by less than three (3) feet <br />in depth, fills less than two (2) feet at any point, and does not interfere with surface drainage in the area. <br />4. Excavations that require the removal of less than 400 cubic yards of earth material are exempted from the <br />IUP requirement. <br />The phrasing of the final exception has caused some ambiguity in terms of enforcement and fee collection. While a <br />project may impact less than 400 cubic yards of material, it may still negatively impact drainage patterns. <br />The City has long employed an administrative permitting process because these excavations still involve a <br />significant amount of earth moving and can have impacts on drainage and erosion control. There are fees that <br />accompany this permit due to the staff time that is used in reviewing the erosion control plan and determining <br />whether the change in contours would negatively impact neighboring parcels. Language supporting the use of <br />administrative permitting occurs in other sections of City Code, but the permit is never expressly established in City <br />Code. The intent of this ordinance is to more clearly articulate the requirement for a Grading Permit. <br />The Engineering Department believes it is appropriate and acceptable to allow small-scale grading projects (less <br />than forth [40] cubic yards) to proceed without a permit, but that any grading project disturbing forty (40) or more <br />cubic yards of earth material should be subject to review by City Staff. Projects larger than 40 cubic yards can have <br />a tangible effect on erosion and runoff patterns and may result in damage to neighboring parcels if not carefully <br />planned. The goal is to make the application process simplistic for the Applicant by requiring base data for square <br />footage of impacted area and changes to contours. Staff can then use this information to better aide the Applicant <br />and calculate cubic yards of disturbance. <br />The draft Ordinance establishes Section 117-58 (Administrative Grading Permits) and outlines the conditions that <br />trigger the permit requirement. It also establishes exemptions to the permit requirement and outlines the basic <br />submittal requirements to accompany the Administrative Grading Permit Application. <br />Alternatives <br />Alternative 41: Adopt Ordinance 416-1 as it is being presented, establishing an Administrative Grading Permit for <br />activities disturbing forty (40) or more cubic yards of earth material. The intent of this Ordinance is to eliminate <br />any ambiguity regarding whether a permit and review by the City is required for certain grading activities. The <br />Ordinance formally establishes the Administrative Grading Permit and provides the City an opportunity to review <br />proposed projects prior to commencement to ensure that there are not unintended, negative impacts on drainage <br />patterns and that proper erosion control measures are in place. The City Council has already adopted the fee as part <br />of Rates and Charges. Staff and the Planning Commission support this alternative. <br />Alternative 42: Adopt Ordinance #16-1 establishing an Administrative Grading Permit for activities, but with a <br />different threshold. After review of several other metro communities, the threshold of forty (40) cubic yards appears <br />to be a common threshold without being overly restrictive. Alternative thresholds could be considered if the City <br />Council desired. <br />Alternative 43: Do not approve Ordinance #16-1. There is some ambiguity in City Code presently about whether <br />any permit or review is necessary for activities that disturb less than 400 cubic yards of material. Staff believes that <br />grading activities disturbing forty (40) or more cubic yards of material should be reviewed for the welfare of <br />adjacent properties to verify that the proposed alterations would not result in detrimental drainage patterns and that <br />appropriate erosion control measures are in place prior to the project beginning. Staff does not support this <br />
The URL can be used to link to this page
Your browser does not support the video tag.