My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/26/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 05/26/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:04:36 PM
Creation date
1/15/2016 2:37:16 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/26/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
924
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
specific Drawings or Specifications in need of clarification and the nature of the clarification requested. The <br />Architect's response to such requests shall be made in writing within any time limits agreed upon, or otherwise with <br />reasonable promptness. If appropriate, the Architect shall prepare and issue supplemental Drawings and <br />Specifications in response to requests for information. <br />§ 3.6.4.5 The Architect shall maintain a record of submittals and copies of submittals supplied by the Contractor in <br />accordance with the requirements of the Contract Documents. <br />§ 3.6.5 CHANGES IN THE WORK <br />§ 3.6.5.1 The Architect may authorize minor changes in the Work that are consistent with t <br />Documents and do not involve an adjustment in the Contract Sum or an extension of the C <br />the provisions of Section 4.3, the Architect shall prepare Change Orders and Construction <br />Owner's approval and execution in accordance with the Contract Documents. <br />§ 3.6.5.2 The Architect shall maintain records relative to changes in the Work. <br />§ 3.6.6 PROJECT COMPLETION <br />§ 3.6.6.1 The Architect shall conduct inspections to determine the date or dates of Substanti <br />date of final completion; issue Certificates of Substantial Completion; receive from the Co <br />the Owner, for the Owner's review and records, written warranties and related documents r <br />Documents and assembled by the Contractor; and issue a final Certificate for Payment bas <br />indicating the Work complies with the requirements of the Contract Documents. <br />in ent of the Contract <br />ntract Time. Subject to <br />ha ge Directives for the <br />1C <br />tra <br />qu <br />mpletion Fnd the <br />or and forward to <br />ed by the Contract <br />on a final inspection <br />§ 3.6.6.2 The Architect's inspections shall be conducted with the Owner to check conforma of the Work with the <br />requirements of the Contract Documents and to verify the accuracy and completeness of the list submitted by the <br />Contractor of Work to be completed or corrected. <br />§ 3.6.6.3 When the Work is found to be substantially complete, the Architect shall inform the Owner ab ie <br />balance of the Contract Sum remaining to be paid the Contractor, including the amount to be retained from <br />Contract Sum, if any, for final completion or correction of the Work. <br />§ 3.6.6.4 The Architect shall forward to the Owner the following information received from f <br />consent of surety or sureties, if any, to reduction in or partial release of retainage or the making of fin <br />affidavits, receipts, releases and waivers of liens or bonds indemnifying the Owner against liens; and (3) any <br />documentation required of the Contractor under the Contract Documents. <br />§ 3.6.6.5 Upon request of the Owner, and prior to the expiration of one year from the date of Su <br />the Architect shall, without additional compensation, conduct a meeting with the Owner to r <br />operations and performance. <br />ARTICLE 4 ADDITIONAL SERVICES <br />§ 4.1 Additional Services listed below are not included in Basic Services but may be requir, d f r the Projhe <br />Architect shall provide the listed Additional Services only if specifically designated in the t:; bl below as <br />Architect's responsibility, and the Owner shall compensate the Architect as provided in Sec io 11.2 <br />(Designate the Additional Services the Architect shall provide in the second column of the . ble below. In the third <br />column indicate whether the service description is located in Section 4.2 or in an attached exhibit. If in an ex a s t <br />identify the exhibit.) <br />Additional Services <br />§ 4.1.1 Programming (B202TM-2009) <br />§ 4.1.2 Multiple preliminary designs <br />§ 4.1.3 Measured drawings <br />§ 4.1.4 Existing facilities surveys <br />§ 4.1.5 Site Evaluation and Planning (B203TM-2007) <br />§ 4.1.6 Building Information Modeling (E202TM— <br />AIA Document B101T' - 2007 (formerly B151T' - 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. <br />All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction <br />or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to <br />the maximum extent possible under the law. This draft was produced by AIA software at 08:58:13 on 08/05/2014 under Order No.24873850101 <br />which expires on 01/27/2015, and is not for resale. <br />User Notes: <br />Responsibility <br />(Architect, Owner <br />or <br />Not Provided) <br />Location <br />(Section <br />attac <br />ervice Description <br />w or in an exhi2 <br />this document and <br />fled below) <br />(945321818) <br />
The URL can be used to link to this page
Your browser does not support the video tag.