Laserfiche WebLink
Responding to the Contractor's requests for information that are not prepared in accordance with the <br />.9 Evaluation of the qualifications of bidders or persons providing proposals; <br />.10 Consultation concerning replacement of Work resulting from fire or other cause during construction; <br />or <br />.11 Assistance to the Initial Decision Maker, if other than the Architect. <br />§ 4.3.2 To avoid delay in the Construction Phase, the Architect shall provide the following Additional Services, <br />notify the Owner with reasonable promptness, and explain the facts and circumstances giving rise to the need. If the <br />Owner subsequently determines that all or parts of those services are not required, the Owner shall give prompt <br />written notice to the Architect, and the Owner shall have no further obligation to compensate the Architect for those <br />services: <br />.1 Reviewing a Contractor's submittal out of sequence from the submittal schedule agreed to by the <br />Architect; - <br />.2 <br />Contract Documents or where such information is available to the Contracto fr.`] a careful study <br />and comparison of the Contract Documents, field conditions, other Owner-p ov''• ed information, <br />Contractor -prepared coordination drawings, or prior Project correspondence or a ocumentation; <br />.3 Preparing Change Orders and Construction Change Directives that require eva uhtion of Contractor's <br />proposals and supporting data, or the preparation or revision of Instruments of Service; <br />.4 Evaluating an extensive number of Claims as the Initial Decision Maker; <br />.5 Evaluating substitutions proposed by the Owner or Contractor and making s bs .uent rev <br />Instruments of Service resulting therefrom; or <br />.6 To the extent the Architect's Basic Services are affected, providing Constru <br />days after (1) the date of Substantial Completion of the Work or (2) the anti <br />Completion identified in Initial Information, whichever is earlier. <br />§ 4.3.3 The Architect shall provide Construction Phase Services exceeding the limits set forth below as Additional <br />Services. When the limits below are reached, the Architect shall notify the Owner: <br />.1 «Two » («2 » ) reviews of each Shop Drawing, Product Data item, sample and similar <br />the Contractor <br />.2 «Six » («6 » ) visits to the site by the Architect over the duration of the Project during construction <br />.3 «Two » («2 » ) inspections for any portion of the Work to determine whether such portion of the <br />Work is substantially complete in accordance with the requirements of the Contract Documents <br />.4 «Two » («2 » ) inspections for any portion of the Work to determine final completion <br />§ 4.3.4 If the services covered by this Agreement have not been completed within «twelve » («12 » ) months of the <br />date of this Agreement, through no fault of the Architect, extension of the Architect's services beyond that time shall <br />be compensated as Additional Services. <br />ARTICLE 5 OWNER'S RESPONSIBILITIES <br />§ 5.1 Unless otherwise provided for under this Agreement, the Owner shall provide information in a timel <br />regarding requirements for and limitations on the Project, including a written program which shall set fort <br />Owner's objectives, schedule, constraints and criteria, including space requirements and relationships, fle ibi ty, <br />expandability, special equipment, systems and site requirements. Within 15 days after receipt r a written eq. est <br />from the Architect, the Owner shall furnish the requested information as necessary and relevan <br />evaluate, give notice of or enforce lien rights. <br />§ 5.2 The Owner shall establish and periodically update the Owner's budget for the Project, including (1) the budget <br />for the Cost of the Work as defined in Section 6.1; (2) the Owner's other costs; and, (3) reasonable contingencies <br />related to all of these costs. If the Owner significantly increases or decreases the Owner's budget for the Cost of the <br />Work, the Owner shall notify the Architect. The Owner and the Architect shall thereafter agrfe to'corresponding' . <br />change in the Project's scope and quality. <br />§ 5.3 The Owner shall identify a representative authorized to act on the Owner's behalf wit <br />The Owner shall render decisions and approve the Architect's submittals in a timely mann <br />unreasonable delay in the orderly and sequential progress of the Architect's services. <br />ect to the Project. <br />rder to avoid <br />§ 5.4 The Owner shall furnish surveys to describe physical characteristics, legal limitations and utility locations fo <br />the site of the Project, and a written legal description of the site. The surveys and legal information shall include, as <br />AIA Document B101= - 2007 (formerly B151= - 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. <br />All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction <br />or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to <br />the maximum extent possible under the law. This draft was produced by AIA software at 08:58:13 on 08/05/2014 under Order No.24873850101 <br />which expires on 01/27/2015, and is not for resale. <br />User Notes: (945321818) <br />