Laserfiche WebLink
Review File: Harvest Estates (15153 Nowthen Blvd. NW) <br />Final Plat <br />May 7, 2015 <br />Page 5 of 6 <br />Only a portion of 152' Lane (proposed <br />Northern street) will be able to be <br />constructed with the current phasing plan <br />due to existing buildings. Interim Step #1 <br />of the current phasing plan would utilize <br />the existing parking lot for the former <br />police station as a `temporary cul-de-sac'. <br />Interim Step #2 of the current phasing plan <br />in the event of delay of Phase II would be <br />to construct an actual cul-de-sac at the end <br />of 152' Lane for Phase I. As the City is <br />aware, these `temporary' cul-de-sacs can be <br />challenging. There are ten (10) lots <br />proposed on 152" d Lane in Phase I. <br />All of 152" Avenue (proposed Southern <br />street) will be able to be constructed as <br />designed without impacts to existing <br />buildings or need for temporary cul-de- <br />sacs. There are fourteen (14) lots proposed <br />on 152' Avenue, all created in Phase I. <br />Additionally, there are seven (7) lots <br />proposed to be created along existing <br />Helium Street. <br />ALPINE DRIVE (153R0 AVENUE N.W.) <br />UTLOT 9 <br />T-T37TTTT1,11 <br />T <br />152ND WAY <br />�i iJri LI-1IL,J/i! +i <br />�1 Ji L.6�L1 �f 1@r19 I 20 <br />1';,,9^1,�. 1 I I I L- �' <br />BLOCK 2 <br />MAO IL <br />x <br />a 6 <br />I g <br />Lr� <br />[III - <br />1Q <br />Historically, the City sees an average of ten (10) to twenty (20) lots per development constructed each year in the <br />current market environment. City Staff has received this feedback from a number of local developers as well. Twenty- <br />one (21) lots would be created with the construction of 152' Avenue and lots created along existing Helium Street. <br />The benefit to the City would be to avoid a phased construction of 152' Lane, avoiding construction staging conflicts <br />and temporary cul-de-sac conditions. The benefit to the Developer would be a lower Financial Guarantee requirement <br />and cost -savings in construction staging and reconstruction. The City's Subdivision Ordinance would provide the <br />City the tools to require full cul-de-sac construction and associated rights -of -way. If the City were to require full cul- <br />de-sac construction and associated right-of-way, two (2) lots would need to be removed from Phase I. <br />Nonetheless, Staff supports the phasing plan as presented, but simply desired to identified the various alternatives <br />that exist to avoid potential conflicts. <br />Grading Plan <br />Development of the Grading Plan has discovered the need for more imported fill to be required than anticipated by <br />the Developer in order to obtain the mix of floor plans desired by the Developer. The geographic area of impact is <br />focused on the future Phase II. <br />