Laserfiche WebLink
Review File: Harvest Estates <br />Preliminary Plat Request <br />Engineering Review <br />Page 5 of 5 <br />• All sanitary sewer shall have 10 gauge solid copper tracer wire. <br />Storm Sewer — Add note: <br />• All manholes not in paved surfaces shall have green carsonite markers. <br />• All storm sewer shall have 10 gauge solid copper tracer wire. <br />Landscaping — Include City on all Correspondence. <br />• All plant material in City ROW shall have two (2) year warranty <br />