Laserfiche WebLink
lour 1111.1siion: To work together to reiposibty grow our community, and to provide quality, coat -effective, and efficient government ierrlcas. <br />CC Regular Session <br />Meeting Date: 05/26/2015 <br />Submitted For: Patrick Brama, Administrative Services <br />By: Patrick Brama, Administrative Services <br />Information <br />Title: <br />Construction of Replacement Fire Station #2; Project 14-30; Change of Project Scope <br />7. 3. <br />Purpose/Background: <br />PURPOSE <br />Consider changing the scope of construction project 14-30, replacement Fire Station #2, by adding the purchase and <br />installation of a 85KW back-up generator; a cost not to exceed $65,000. <br />BACKGROUND (case/ Fire Station #2): <br />The Council approved the construction of a replacement Fire Station #2 on April 14, 2015 by awarding a <br />construction contract to Brennen Construction of Mankato Attached to this case is the project budget (now revised <br />to include the generator). Please review the April 14 case for a detailed background on this project/ process. <br />BACKGROUND (change of scope) <br />What is the proposed change? <br />To date, the City has not planned for (budgeted/ designed/ etc.) for the inclusion of a back-up generator <br />within the scope of this project. The City, not the architect or general contractor, provided this direction. As <br />outlined in the "question" below, the City originally anticipated Anoka County would provide capacity for <br />back-up power to Fire Station #2. However, as discussions with Anoka County have transpired, they will not <br />be able to provide sufficient back-up power for Fire Station #2. As a result, the City is proposing to change <br />the scope of this project, to include said work (purchase and installation of a 85KW back-up generator). The <br />estimated cost of this work, is not to exceed $65,000. Attached is the lowest competitive proposal received. <br />Why wasn't this a part of the original scope? <br />Attached to this case is a reference map. A permanent easement, in favor of Anoka County, was recorded on <br />this City owned parcel in 2006. The purpose of this easement was to allow Anoka County to construct a <br />communications tower. This improvement/ easement included a secured, fenced in area containing the tower, <br />and a back-up generator. Said improvements were completed in 2006. <br />As part of the 2006 discussions/ negotiations RE the permanent easement for the Anoka County <br />communications tower, the City had an understanding (informal) that Anoka County would design their <br />back-up generator to serve both their communications tower and the future Fire Station #2. <br />Unfortunately, as time transpired from 2006 to now, that verbal agreement/ understanding had been lost. <br />Anoka County did install a back-up generator within their easement. However, the Anoka County generator <br />is vastly undersized for serving the new Ramsey Fire Station #2. For the past 12 months, the City has been <br />working with Anoka County to resolve this issue. Until recently, staff was confident the Anoka County would <br />