Laserfiche WebLink
Exhibit B <br />Improvement Project Costs <br />Bid Prices <br />Sanitary sewer (incl. trunk, lateral, and service stubs) $ <br />Watermain (incl. trunk, lateral, and service stubs) $ <br />Storm drainage facilities $ <br />Streets (incl. concrete C&G and lot grading) $ <br />Trail development $ <br />Street striping and signing $ <br />Street lights $ <br />Sub -total $ <br />Contingency Costs <br />10% Contingency $ <br />Sub -total $ <br />Engineering Costs <br />5.5% City Construction Administration/Inspection $ <br />2.0% City Construction Testing $ <br />Sub -total $ <br />Grand Total 1 $ <br />RIDGEPOINT <br />Assessment Agreement <br />Page 7 of 8 <br />