My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/09/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 06/09/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:05:27 PM
Creation date
1/15/2016 2:53:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/09/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Parkview East <br />Final Site Plan Review <br />June 4, 2015 <br />Page 2 of 3 <br />planned was 283 parking stalls. At this stage, the final plans will need to be adjusted to get to a parking ratio of 2.0 <br />stalls per unit or a conditional use permit should be approved. Approval of the CUP would be anticipated in July. <br />The additional spaces are not in a response to building code but rather based on perceived need by the Developer <br />due to the number of two (2) and three (3) bedroom units in the building which could result in more parking demand. <br />The proposed break down in units is forty-one (41) percent one (1) bedroom; forty-five (45) percent two (2) bedroom <br />and fourteen (14) percent three bedroom. The additional spaces will also prevent potential use of on -street parking <br />which is particularly important during summer months when the adjacent park is programmed. However, Staff would <br />encourage the Developer to utilize available on -street parking availability on Sapphire Street and 145`h Avenue, which <br />is not directly impacted by events in The Draw Park and Amphitheater. <br />As the surface parking lot is well screened by either the apartment building or the detached garage structures, and <br />therefore not visible from the roadways, staff supports the additional parking. If concern exists the Planning <br />Commission could recommend that some excess parking be included as a proof of parking area until the need for <br />additional spaces is evident. <br />This topic was also addressed by the City's Environmental Policy Board, who suggested at looking at ways to reduce <br />the amount of surface parking area and enhancing the internal landscaping for the benefit of future residents. Details <br />on the EPB discussion are covered in the Landscape Technical Report. <br />Architectural Standards. High quality architecture and building materials is an essential component in fulfilling the <br />objectives of the COR Design Framework. Roof design, materials, amount of windows, and overall design that breaks <br />up the different floors and walls are all important elements to the overall building design. In the COR -1 sub -district <br />buildings are placed closer to the street so greater emphasis is placed on materials and design features at the street <br />level. <br />The proposed materials consist of stone and brick at the base. The rear elevation includes an enhanced stone entry <br />with canopy and additional stone above. Other materials include composite panel (i.e. fiber cement panels) and steel <br />lap and vertical siding. Metal siding can be used as a complementary material. In COR -1 sub -district buildings shall <br />be primarily brick or comparable alternative and shall comprise a minimum of fifty (50) percent of the non -glazed <br />wall area. Calculations shall be provided for brick and stone for each elevations. The City can approve deviations to <br />the 50% brick or stone requirement provided that another high-quality material is provided. <br />The combination of composite and steel in the differing patterns divides the floors and sections of the building. <br />Multiple sections of the building are articulated to break up the flat wall. In addition windows and decks are proposed <br />for each unit that provide further breaks in the building wall design. Additional information is required for the specific <br />appearance of the individual air conditioning units. Staff is concerned over the appearance, color, size and overall <br />look of units on each elevation. <br />The south elevation includes garage doors for tuck under garages. Garage doors shall be in colors that are <br />complementary to the main building materials. The roof design is pitched with asphalt shingles. The elevation facing <br />Ramsey Parkway is actually the rear of the building and contains the same materials as the front. The first floor <br />contains windows to create street -level interest and pedestrian scale along this street frontage. <br />Five detached garage buildings are planned in the southern portion of the site. Three long buildings each containing <br />16 stalls are located in a row along the south property line with two additional buildings just north of this row <br />containing 22 stalls each. The garage buildings contain the same materials as the apartment building. The roofs are <br />pitched with additional accenting so that they are of a higher design standard than typical detached structures. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.