<br />A total of 8 bids were received and opened on June 3rd. The project was bid using a base bid for the reconstruction
<br />of Garnet Street and 168th Avenue, plus two alternate bids. Bid alternate 41 is for the permanent construction of the
<br />Feldspar Street cul-de-sac, and bid alternate 42 is for constructing a temporary cul-de-sac at the west end of 168th
<br />Avenue in the event the Brookfield 6th Addition development was not under construction at the time this project
<br />started. Because the Brookfield 6th Addition is scheduled to begin construction before this project, alternate bid 42
<br />will not be required and should therefore be dismissed.
<br />The bid summary is below, and is included in the attached resolution. If Council wishes to accept bid alternate 41
<br />for constructing the permanent cul-de-sac on Feldspar Street, a contract should be awarded to Kuechle Underground
<br />with a low bid of $823,126.51 (compared to Douglas-Kerr's bid of $827,565.61). If Council does not wish to
<br />construct the permanent cul-de-sac on Feldspar Street, the low bidder would then be Douglass -Kerr Underground
<br />with a base bid of $787,330.49.
<br />CONTRACTOR
<br />BASE
<br />BID
<br />ALT.I
<br />BID
<br />ALT.2
<br />BID
<br />TOTAL
<br />BID
<br />Kuechle Underground
<br />$790,449.61
<br />$32,676.90
<br />$35,748.76
<br />$858,875.27
<br />Douglas -Kerr Underground_
<br />$787,330.49
<br />$40,235.12
<br />$35,687.66*
<br />$863,253.27*
<br />Dave Perkins Contracting
<br />$815,630.75
<br />$32,229.00
<br />$46,158.00
<br />$894,017.75
<br />Dressel Contracting
<br />$997,870.08*
<br />$43,110.71
<br />$56,944.28*
<br />$1,097,925.07*
<br />R L Larson Excavating
<br />$1,052,785.00
<br />$37,309
<br />$49,096.00
<br />$1,139,190.00
<br />Northwest Asphalt
<br />$1,040,168.58
<br />$51,517.50
<br />$52,186.40
<br />$1,143,872.48
<br />Redstone Construction
<br />$1,068,883.16
<br />$42,423.92 1$44,067.00
<br />$1,155,374.08
<br />orthdale Construction Co.
<br />$1,119,883.99
<br />$42,396.28
<br />$54,130.85
<br />$1,216,411.12
<br />Engineer's Estimate
<br />$954,468.75
<br />$30,473.25
<br />$42,521.00
<br />$1,027,463.00
<br />*= adjusted bid price
<br />Alternatives:
<br />Alternative Action 41 — Motion to adopt Resolution 415-06-147 Accepting Bids and Awarding a Contract for
<br />Garnet Street and 168th Avenue Reconstruction, Improvement Project 413-10, including the base bid plus alternate
<br />bid 41.
<br />Alternative Action 42 — Motion to adopt Resolution #15-06-147 Accepting Bids and Awarding a Contract for
<br />Garnet Street and 168th Avenue Reconstruction, Improvement Project 413-10, including only the base bid.
<br />Alternative Action 43 — Motion to deny adoption of Resolution 415-06-147 at this time.
<br />Funding Source:
<br />This improvement project, which is included in the City's 5 -year Capital Improvement Plan for construction in
<br />2015, is proposed to be funded using a combination of street reconstruction and overlay bond funds, special
<br />assessments to benefiting properties, and sewer, water and stormwater utility funds.
<br />Per the adopted Special Assessments Policy, the City may consider assessing up to 25% of applicable street
<br />reconstruction project costs. However, based on the existing large lot sizes (2+ acres) and street frontages (200+
<br />linear feet) along these streets, the preliminary special assessment proposed in the Feasibility Report is set at $6,500
<br />per lot which totals $78,000 for the 12 single-family residential properties with direct access onto the improved
<br />street segments.
<br />The Assessment Hearing is scheduled for October 13th. The results of the special assessment benefit appraisal
<br />consultation will be available for this hearing to verify that the preliminary assessment amount does not exceed the