No notifications are required for this case. <br />Observations/Alternatives: <br />Observations: <br />A total of 8 bids were received and opened on June 3rd. The project was bid using a base bid for the reconstruction <br />of Garnet Street and 168th Avenue, plus two alternate bids. Bid alternate 41 is for the permanent construction of the <br />Feldspar Street cul-de-sac, and bid alternate 42 is for constructing a temporary cul-de-sac at the west end of 168th <br />Avenue in the event the Brookfield 6th Addition development was not under construction at the time this project <br />started. Because the Brookfield 6th Addition is scheduled to begin construction before this project, alternate bid 42 <br />will not be required and should therefore be dismissed. <br />The bid summary is below, and is included in the attached resolution. If Council wishes to accept bid alternate 41 <br />for constructing the permanent cul-de-sac on Feldspar Street, a contract should be awarded to Kuechle Underground <br />with a low bid of $823,126.51 (compared to Douglas-Kerr's bid of $827,565.61). If Council does not wish to <br />construct the permanent cul-de-sac on Feldspar Street, the low bidder would then be Douglass -Kerr Underground <br />with a base bid of $787,330.49. <br />CONTRACTOR <br />BASE <br />BID <br />ALT.I <br />BID <br />ALT.2 <br />BID <br />TOTAL <br />BID <br />Kuechle Underground <br />$790,449.61 <br />$32,676.90 <br />$35,748.76 <br />$858,875.27 <br />Douglas -Kerr Underground_ <br />$787,330.49 <br />$40,235.12 <br />$35,687.66* <br />$863,253.27* <br />Dave Perkins Contracting <br />$815,630.75 <br />$32,229.00 <br />$46,158.00 <br />$894,017.75 <br />Dressel Contracting <br />$997,870.08* <br />$43,110.71 <br />$56,944.28* <br />$1,097,925.07* <br />R L Larson Excavating <br />$1,052,785.00 <br />$37,309 <br />$49,096.00 <br />$1,139,190.00 <br />Northwest Asphalt <br />$1,040,168.58 <br />$51,517.50 <br />$52,186.40 <br />$1,143,872.48 <br />Redstone Construction <br />$1,068,883.16 <br />$42,423.92 1$44,067.00 <br />$1,155,374.08 <br />orthdale Construction Co. <br />$1,119,883.99 <br />$42,396.28 <br />$54,130.85 <br />$1,216,411.12 <br />Engineer's Estimate <br />$954,468.75 <br />$30,473.25 <br />$42,521.00 <br />$1,027,463.00 <br />*= adjusted bid price <br />Alternatives: <br />Alternative Action 41 — Motion to adopt Resolution 415-06-147 Accepting Bids and Awarding a Contract for <br />Garnet Street and 168th Avenue Reconstruction, Improvement Project 413-10, including the base bid plus alternate <br />bid 41. <br />Alternative Action 42 — Motion to adopt Resolution #15-06-147 Accepting Bids and Awarding a Contract for <br />Garnet Street and 168th Avenue Reconstruction, Improvement Project 413-10, including only the base bid. <br />Alternative Action 43 — Motion to deny adoption of Resolution 415-06-147 at this time. <br />Funding Source: <br />This improvement project, which is included in the City's 5 -year Capital Improvement Plan for construction in <br />2015, is proposed to be funded using a combination of street reconstruction and overlay bond funds, special <br />assessments to benefiting properties, and sewer, water and stormwater utility funds. <br />Per the adopted Special Assessments Policy, the City may consider assessing up to 25% of applicable street <br />reconstruction project costs. However, based on the existing large lot sizes (2+ acres) and street frontages (200+ <br />linear feet) along these streets, the preliminary special assessment proposed in the Feasibility Report is set at $6,500 <br />per lot which totals $78,000 for the 12 single-family residential properties with direct access onto the improved <br />street segments. <br />The Assessment Hearing is scheduled for October 13th. The results of the special assessment benefit appraisal <br />consultation will be available for this hearing to verify that the preliminary assessment amount does not exceed the <br />