My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 01/26/2016
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2016
>
Agenda - Council Work Session - 01/26/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:46:59 PM
Creation date
1/29/2016 10:07:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
01/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Location: Pbrama>HDrive>Legislativelnitiatives>2016 <br />(2) Ground Water <br />ISSUE: A clean and reliable source of ground water is critical to the function of any healthy community. In <br />many cases, communities utilize aquifers as their primary source of ground water. The City of Ramsey is <br />located in a "recharge zone" for aquifers utilized throughout the Twin Cities Metro region, known as the <br />"Anoka County Sand Plain." <br />The City of Ramsey is a developing community and anticipates significant growth over the next two <br />decades. As a result, additional water supply will be required to meet the demand of future development. <br />Recently, the City of Ramsey was notified by the Department of Natural Resources (DNR) that the City <br />'MAY' no longer be permitted to install new wells to utilize aquifers as a water source without first <br />evaluating the ability to use surface waters, such as the Mississippi River. The DNR made this decision in <br />order to protect existing, and future, ground water supplies of communities throughout the entire Twin <br />Cities Metro region. <br />As a result, the City of Ramsey recently began planning for a new surface water treatment plant, which <br />would draw from the Mississippi River. The City does plan to retain its ground water supply system as a <br />back-up to the purposed surface water supply system. The estimated cost of the proposed surface water <br />treatment plant in Ramsey is significant, at $36.5 million. Costs for retaining the ground water supply <br />system will be minimal compared to the treatment facility costs. <br />Clearly, utilization of ground water resources is not solely a local issue, as aquifers and "recharging zones" <br />span across the entire Twin Cities metro region. The need for the City of Ramsey to switch from a ground <br />water system to a surface water system is not a result of development in the City of Ramsey alone; it is the <br />result of demand across the entire Twin Cities metro region. <br />RECOMMENDATION: The City of Ramsey supports a regional analysis and planning effort to utilize ground <br />and surface water throughout the Twin Cities as a whole, rather than community -by -community. The City <br />of Ramsey opposes actions limiting the ability of Ramsey to develop in order to sustain, or allow new <br />development, in other Twin Cities communities affected by the Anoka County Sand Plain "recharge zone." <br />The City of Ramsey supports regional solutions to address regional ground water supply concerns; <br />specifically including, regional funding sources. <br />>Topic is consistent with 2016 LMC Legislative Platform SD -61: Municipal Public Water Supplies (link) <br />2016 City of Ramsey Legislative Platform <br />
The URL can be used to link to this page
Your browser does not support the video tag.