My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/26/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 01/26/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:46:01 PM
Creation date
1/29/2016 10:22:37 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2.2 City Contribution <br />The City contribution to the project will include all funding in excess of the amount <br />collected through special assessments to benefiting properties. No funds were budgeted <br />for this project. <br />The City would utilize previously encumbered 5 -year street reconstruction bonds for the <br />City's contribution for project costs related to surface (street) improvements. Stormwater <br />Utility Funds would be utilized for all storm sewer improvements. <br />Special assessments would be used to pay back a portion of these costs based on the term <br />of the special assessments as adopted by Council at the end of the project. <br />Table 1 illustrates the proposed project funding based on the proposed design. This table <br />assumes construction will occur in 2016. If the alternate design is constructed the City's <br />contribution would be reduced slightly since estimated construction costs for the alternate <br />design are $51,000 less than the proposed design. <br />Estimated Costs <br />TABLE 1 <br />Proposed Project Funding <br />ASSESSMENTS <br />CITY FUNDS <br />TOTAL <br />$594,750 <br />$2,361,250 <br />$2,956,000 <br />Total Project Cost <br />Less Special Assessments <br />Subtotal <br />Less City Bonding Funds <br />Subtotal <br />Less Stormwater Utility Funds <br />TOTAL Remaining Cost <br />$2,956,000 <br />$594,750 <br />$2,361,250 <br />$1,823,250 <br />$538,000 <br />$538,000 <br />$0 <br />Feasibility Report <br />Andrie Street and 164th Lane Reconstruction <br />City of Ramsey Project No. 16-00 Division C <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.