My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/26/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 01/26/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:46:01 PM
Creation date
1/29/2016 10:22:37 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C4.0 NTI <br />NORTHERN <br />TECHNOLOGIE5,INC. <br />November 23, 2015 <br />1408 Northland Drive, Suite 107 <br />Mendota Heights, MN 5E120 <br />P:763.432.9175 F:651.389.4190 <br />www.NTIgeo.com <br />City of Ramsey <br />Attention: Bruce Westby <br />7550 Sunwood Drive Northwest <br />Ramsey, MN 55303 <br />Subject: Geotechnical Exploration and Engineering Review <br />Andrie Street Improvement Project <br />Ramsey, Minnesota <br />NTI Project No. 15.61197.100 <br />Unearthing confidence -- <br />Northern Technologies, Inc. (NTI) has completed a total of 22 soil borings for the Andrie Street and 164th <br />Lane reconstruction project in Ramsey, Minnesota. The scope of services included determining existing <br />bituminous and aggregate base thicknesses, and subsurface conditions, and providing recommendations <br />for site preparation, excavations, engineered fill and compaction, depths of unsuitable soils to be <br />removed, ground water management and potential difficulties during construction. Our services were <br />performed in accordance with our proposal dated September 21, 2015. <br />PROJECT AND SITE DESCRIPTION <br />The proposed project consists of improvements to the existing Andrie Street/164th Lane starting at <br />Alpine Drive and terminating at Jarvis Street in the City of Ramsey, Minnesota. NTI assumes that the <br />proposed project may include below grade utility improvements, minor grade changes and resurfacing <br />the roadway. <br />NTI was not aware of invert elevations or other design details of the proposed utilities at the time this <br />report was prepared. <br />SUBSURFACE EXPLORATION SUMMARY <br />NTI performed the subsurface exploration program during the period of November 3 to November 4, <br />2015 with a two -person crew using a truck -mounted CME -55 drill rig. Samples were generally collected <br />in accordance with ASTM D 1586 "Standard Test Method for Standard Penetration Testing (SPT) and <br />Split -Barrel Sampling of Soils." At each location, a pavement core was performed to obtain the thickness <br />of the existing pavement. <br />Precision • Expertise Geotechnical • Materials <br />BISMARCK • GRAND FORKS • MINOT • MENDDTAHEIGHTS • RAMSEY • ST.CLDUD <br />
The URL can be used to link to this page
Your browser does not support the video tag.