My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/26/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 01/26/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:46:01 PM
Creation date
1/29/2016 10:22:37 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�l <br />Andrie Street Improvements <br />Ramsey, Minnesota <br />NTI Project No. 15.61197.100 <br />If frost penetrates the soil prior to paving, soils must be thawed, scarified, and re -compacted as <br />recommended in this report. Subgrade soils should be inspected prior to paving to verify frozen <br />conditions are not present. <br />CLOSURE <br />The conclusions and recommendations in this report are predicated on observation and testing of the <br />earthwork directed by Geotechnical Engineer of Record. Our opinions were based on data assumed <br />representative of the site, as encountered from the 22 soil borings on site. For this and other reasons, <br />we do not warrant conditions below the depth of our borings, or that the strata logged from our borings <br />are necessarily typical across the site. Deviations from our recommendations by plans, written <br />specifications, or field applications shall relieve us of responsibility unless our written concurrence with <br />such deviations has been established. <br />Our conclusions and recommendations are predicated on observation and testing of the earthwork <br />directed by Geotechnical Engineer of Record. Our opinions are based on data assumed representative <br />of the site. However, the area coverage of borings in relation to the entire project is very small. For this <br />and other reasons, we do not warrant conditions below the depth of our borings, or that the strata <br />logged from our borings are necessarily typical of the site. Deviations from our recommendations by <br />plans, written specifications, or field applications shall relieve us of responsibility unless our written <br />concurrence with such deviations has been established. <br />The scope of services for this project does not include either specifically or by implication any <br />environmental or biological assessment of the site or identification or prevention of pollutants, <br />hazardous materials or conditions. If the owner is concerned about the potential for such contamination <br />or pollution, other studies should be undertaken. <br />This report has been prepared for the exclusive use of The City of Ramsey and its agents for specific <br />application to the proposed project areas. Northern Technologies, Inc. has endeavored to comply with <br />generally accepted geotechnical engineering practice common to the local area. Northern Technologies, <br />Inc. makes no other warranty, express or implied. <br />Northern Technologies, Inc. <br />Steven D. Gerber, P.E. <br />Senior Engineer <br />49" <br />Ryan M. Benson, P.E. Regional Manager/ <br />Principal Engineer <br />SDG/rmb <br />I hereby certify that this plan, <br />specification, or report was prepared by <br />me or under my direct supervision and <br />that I am a Duly Licensed Professional <br />Engineer under the Laws of the State of <br />Minnesota. <br />Steven D. Gerber <br />Date: 11/23/2015 Reg. No. 45298 <br />Page 5 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.