My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/26/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 01/26/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:46:01 PM
Creation date
1/29/2016 10:22:37 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Andrie Street Improvements <br />Ramsey, Minnesota <br />NTI Project No. 15.61197.100 <br />GEOTECHNICAL EVALUATION OF RECOVERED SOIL SAMPLES <br />We visually examined recovered soil samples to estimate distribution of grain sizes, plasticity, <br />consistency, moisture condition, color, presence of lenses and seams, and apparent geologic origin. We <br />then classified the soils according using the Unified Soil Classification System (ASTM D2488). A chart <br />describing this classification system and general notes explaining soil sampling procedures are presented <br />within appendices attachments. <br />The stratification depth lines between soil types on the logs are estimated based on the available data. <br />In-situ, the transition between type(s) may be distinct or gradual in either the horizontal or vertical <br />directions. The soil conditions have been established at our specific boring locations only. Variations in <br />the soil stratigraphy may occur between and around the borings, with the nature and extent of such <br />change not readily evident until exposed by excavation. These variations must be properly assessed <br />when utilizing information presented on the boring logs. <br />We request that you, your design team or contractors contact NTI immediately if local conditions differ <br />from those assumed by this report, as we would need to review how such changes impact our <br />recommendations. Such contact would also allow us to revise our recommendations as necessary to <br />account for the changed site conditions. <br />Page 8 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.