Laserfiche WebLink
METROPOLITAN COUNCIL <br />CAPITAL PROGRAM <br />ENVIRONMENTAL SERVICES <br />TABLE G-2 <br />($ IN 000S) <br />Prog # Project # Project Name <br />TREATMENT PLANT PROJECTS <br />8018 BI Lk WWTP Improve <br />2015 <br /><2015 Changes Current 2015 2016 2017 2018-2020 Total Total <br />Authorized Capital Program (ACP) <br />Prj801800 BI Lk WWTP Improvements 14,974 - 14,974 <br />Prj801810 BI Lk WWTP Survey/Record 72 - 72 <br />Prj_801820 BI Lk WWTP Bio -P Improve 8,040 - 8,040 <br />Prj801825 BI Lk WWTP Site Prep 3,325 - 3,325 <br />Prj_801828 BI Lk WWTP Dewatering Wells 677 - 677 <br />Prj801830 BI Lk WWTP Liquids Ph 1 51,123 - 51,123 <br />Prj801835 BI Lk WWTP HVAC Improve 248 - 248 <br />Prj801837 BI Lk WWTP Site and Levee Rem 252 - 252 <br />Prj801840 BI Lk WWTP Solids 33,325 - 33,325 <br />Prj_801845 BI Lk WWTP Elec Improve 150 - 150 <br />Prj801847 Blue Lake GTO Piping Replaceme 275 - 275 <br />Prj_801860 BI Lk WWTP Integrated Controls 490 - 490 <br />Prj801865 BI Lk WWTP Network Refresh 160 - 160 <br />Prj801868 Blue Lake Electrical & PLCs 796 - 796 <br />Prj801870 BI Lk WWTP Effluent Pump 801 - 801 <br />Prj801875 BL LK WWTP Generator Retrofit 100 - 100 <br />Prj_801880 Blue Lake Plant Misc Improveme 1,207 - 1,207 <br />Prj801882 Blue Lake Process & Structural 875 - 875 <br />Prj_801885 Blue Lake Containers Scr & Gri 110 - 110 <br />Total BI Lk WWTP Improve 117,000 - 117,000 <br />8074 Empire WWTP Solids Impr <br />Prj807400 Empire WWTP Solids Improve 14,825 - 14,825 - - - - - 14,825 <br />Prj807410 Empire Solids - Digester Build 175 - 175 - - - - - 175 <br />Total Empire WWTP Solids Impr 15,000 - 15,000 - - - - - 15,000 <br />8072 Energy Constr and Recovery <br />Prj_807200 Energy Cons and Recovery 4,800 - 4,800 - - - - - 4,800 <br />Prj807230 Solar PV Systems 200 - 200 - - - - - 200 <br />Total Energy Constr and Recovery 5,000 - 5,000 - - - - - 5,000 <br />8030 Hastings WWTP Node <br />Prj803000 Hastings WWTP 6,400 - 6,400 - - - 58,500 58,500 64,900 <br />Prj803010 Hastings WWTP Improvements 100 - 100 - - - - - 100 <br />Total Hastings WWTP Node 6,500 - 6,500 - - - 58,500 58,500 65,000 <br />8073 MWWTP Nutrient Removal Proj <br />Prj807300 MWWTP Nutrient Removal 1,750 1,000 2,750 - - - - - 2,750 <br />Prj_807310 WWTP Phosphorus & Solids Reduc 1,000 - 1,000 - - - - - 1,000 <br />Prj807320 MWWTP Nutrient Removal - Reuse 250 - 250 - - - - - 250 <br />Total MWWTP Nutrient Removal Proj 3,000 1,000 4,000 - - - - - 4,000 <br />8059 MMWTP Rehab & Fac Improve <br />Prj805900 MWWTP Rehab & Fac Improve 8,416 32,000 40,416 - 30,000 - - 30,000 70,416 <br />Prj805910 MWWTP Primary Settling Tanks 3,515 3,515 - - - 3,515 <br />Prj805915 MWWTP Sludge Storage Rehab 5,000 5,000 - - - 5,000 <br />Prj805916 MWWTP Sludge Storage Mixers 800 - 800 - - - - - 800 <br />Prj_805920 MWWTP Final Settling Tanks 3,400 - 3,400 - - - - - 3,400 <br />Prj805921 NWWTP WSE FST Inlet Gate Repl 462 - 462 - - - - - 462 <br />Prj_805922 MWWTP EPT Improvements 4,280 - 4,280 - - - - - 4,280 <br />Prj805923 MWWTP Eff Pump Emrg Generators 2,370 - 2,370 - - - - - 2,370 <br />Prj805924 MWWTP F&I Bldg No 1 Demo 6,506 - 6,506 - - - - - 6,506 <br />Prj805925 MWWTP Elec Power Gen & Dist 2,300 - 2,300 - - - - - 2,300 <br />Prj805926 MWWTP Non-Cond Steam Turbine 2,516 - 2,516 - - - - - 2,516 <br />Prj_805927 MWWTP Cable Replacement 802 - 802 - - - - - 802 <br />Prj805928 MWWTP Elec Cable Rep Ph3 2,000 - 2,000 - - - - - 2,000 <br />Prj_805929 MWWTP RAS/WASE Pumps 3,800 - 3,800 - - - - - 3,800 <br />Prj805930 MWWTP Tunnel Light Energy Red 940 - 940 - - - - - 940 <br />Prj_805931 MWWTP HVAC Improv Phase I 1,490 - 1,490 - - - - - 1,490 <br />Prj805941 MWWTP Aeration Tanks 9-12 1,471 - 1,471 - - - - - 1,471 <br />Prj805942 MWWTP Biofilter BI01 Pipe Acc 317 - 317 - - - - - 317 <br />Prj_805944 MWWTP Flotation Thickeners 5,120 - 5,120 - - - - - 5,120 <br />Prj805945 MWWTP Solids Proc Equip System 1,600 - 1,600 - - - - - 1,600 <br />Prj_805946 MWWTP Solids Proc Equip 21,854 - 21,854 - - - - - 21,854 <br />Prj805949 MWWTP Vactor Waste Ph 1 288 - 288 - - - - - 288 <br />Prj_805950 MWWTP Vector Waste Site 3,083 - 3,083 - - - - - 3,083 <br />Prj_805951 MWWTP Liq Waste Rec Tun Ramp 42 - 42 - - - - - 42 <br />Capital Improvement Plan (CIP) <br />ACP+CIP <br />14,974 <br />72 <br />8,040 <br />3,325 <br />677 <br />51,123 <br />248 <br />252 <br />33,325 <br />150 <br />275 <br />490 <br />160 <br />796 <br />801 <br />100 <br />1,207 <br />875 <br />110 <br />117,000 <br />G-11 <br />