My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 07/10/1978 - Public Hearings
Ramsey
>
Public
>
Minutes
>
Council
>
1978
>
Minutes - Council - 07/10/1978 - Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:36:43 PM
Creation date
5/14/2004 12:00:11 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Title
Public Hearings
Document Date
07/10/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br /> <br /> Public Hearing/7-10-78 <br /> (Street Peri,dons) <br /> <br />Bob Ilstrup, 16241 Yttri~n, said concerning the cost, i~1000 vs ~3000, he <br />w,mld rather -take the '.[~1000 investment now instead of suburban sections <br />which are triple. He woul5 rather be tearing up s ~1000 rcs8 an8 iff it <br />will last for 15 years~ he is for it. <br /> <br />Duane Davis said there is a lot of rain this ~ar and the~ost will be <br />~eep aud a severe winter could cause a lot of orob!ems with ~rost boils <br />i~ tTte c~ · <br /> <br />B, Ilstrup asked, won't this fill up somebodies ditch somewhere? <br /> <br />Engineer D~.atikka said the only ohher solution wo~d be ~o install s%orm sewers. <br /> <br />The ~jori-~y o~ citizens ~sent ~yom Men~ald Coun%ry Park were i~x ~a¥or o~ <br />the street -project. A hand ~ou~ vote was taken~ rest. t: 9 to 2 i= ~avor. <br /> <br />Total Cost TotaI Units Cost Per Unit Annual Unit Cost 7~1.0 .~. 1 <br /> <br /> ~.~2o,000 26 .? 077 ~15~ i~118 <br /> <br />]bon Miller, 15000 Zeolite - you 8on't ]mmw when sewer an8 ~.~ater ~.~ill <br />through a'aa if we put ~ve8 streets in that will be torn ou~ later, <br />in favor .. ~_ waiting. <br /> <br />Zrwi~ Oeigle, 7920 151st Lane wo~8 like a total cost of how much his ta~es <br />will go up, the project cost 8own the roa8 with this, in terms of mainte~anc% <br />reglacement, etc. <br /> <br />~.~.yor Co~ said he d:iscusse~ maintenance of blacktop streets with the street <br />suoeri~ten~ent an~ he indicate8 that grading, plowing, Class 5 versus <br />sealc~stin~',~, base~ on his past e~erience, he ~eels the costs of maintenance <br />~.ill he ~bout the s~me. <br /> <br />~,~. Gei~le sai~ he 8oesn't think this ~ill get 8one by this Fall~ how <br />stable are these cost? What are projects costs for the sm~er 19797 <br /> <br />Er~.[~mer ~atikka state8 he talked to a contractor today an8 exacts <br />see a 20 perce~t increase ne~ s~er. <br /> <br />~[r. Geigle asked if we have trucks reg~ulate8 so the streets will not be <br />disrupto~. <br /> <br />Answer: The County roads are posted now. <br /> <br />Tom Falck, 152nd Lane asked, if they 8on't start in September, will we still <br />pay tho costs of the bi8 given for this s~er. <br /> <br />Engiueer I~aati~m replie~, yes. <br /> <br />Ron Miller, 15000 Zeolite eske~ if a~ty com~rison has been made bet~.~een <br />our are~ ~e a similar or surrounding area for project cost. <br /> <br />E~gi~eer Poat~ kka said he base8 prices on past bids taken in other .... ~ ..... <br /> . -- OO~.l~ <br /> <br />GREENLAI~D IIILLS ADDITION <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.