My WebLink
|
Help
|
About
|
Sign Out
Home
03/03/16
Ramsey
>
Economic Development Authority
>
Full Agendas
>
2010's
>
2016
>
03/03/16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:42:31 AM
Creation date
3/10/2016 11:36:05 AM
Metadata
Fields
Template:
Full Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The ponds depicted on Figure 16 in Appendix A depict areas that are best suited for regional rate control <br />basins only. Additional design parameters and regional storm water management planning should be <br />further refined as the areas begin to develop. <br />Cost estimates were not developed for the regional pond construction or internal site storm sewer <br />conveyance. It is anticipated that costs associated with pond construction will be completed by the <br />developer as a portion of the site grading. Also, it is assumed that internal site drainage will be <br />accommodated by dry swales and ditch systems to reduce storm sewer costs. <br />Street Lighting <br />The costs included for street lighting were derived from recent projects within the City of Ramsey and <br />are considered to be reasonable costs associated with providing street and pedestrian lighting along the <br />corridors. Costs include conduit, wiring and the actual light fixtures to be installed. The density of the <br />lighting fixtures is similar to the level provided along the recently constructed Riverdale Drive, east of <br />Armstrong Boulevard. Our understanding is the spacing may be increased (decreasing the number of <br />fixtures) for Phases 2 and 3. This may slightly reduce the costs associated with these phases. The costs <br />provided are considered conservative for that reason and may be reduced depending upon the types of <br />developments proposed. <br />Trails/Sidewalks <br />Existing trails were previously constructed along the north side of Bunker Lake Boulevard and the west <br />side of Puma Street. Project costs were prepared which include trails along the south side of Bunker <br />Lake Boulevard and the east side of Puma Street. <br />Phase Transitions <br />There is the potential for portions of the roadways to be constructed to wider sections than currently <br />exist. If this occurs, the new roadways will need to taper to meet the existing roadway widths. The <br />tapered sections will then be removed as the next phase of improvements is completed. Costs were <br />included in each phase for these tapering sections. <br />Right Turn Lane Additions <br />The roadways depicted in the exhibits depict through lanes and left turn lanes. Right turn lanes will be <br />required at each access off of Bunker Lake Boulevard and Puma Street. Individual access locations were <br />not considered in this study, and so the locations and lengths of right turn lanes were not considered at <br />this time. The actual access locations will be dependent upon the type of land use and internal site <br />characteristics. We included allowances for the right turn lanes in each phase for budgeting purposes. <br />Landscaping <br />The base project includes a very utilitarian approach to the area. Bituminous trails and lighting were <br />included, but other features, such as trees, shrubs, decorative features and monuments are not included <br />in the estimated project costs. <br />Prepared by: Bolton & Menk, Inc. ADDITIONAL ANALYSIS <br />City of Ramsey — Future Business Park Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.