My WebLink
|
Help
|
About
|
Sign Out
Home
03/03/16
Ramsey
>
Economic Development Authority
>
Full Agendas
>
2010's
>
2016
>
03/03/16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:42:31 AM
Creation date
3/10/2016 11:36:05 AM
Metadata
Fields
Template:
Full Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These types of improvements are typically inspected by the City for conformity with applicable codes <br />and standards, but are constructed by the property owner. <br />Figure 17 depicts the lots considered for this report and also provides additional information related to <br />each lot. Similar information is presented in the following table: <br />Identification Zoning Gross Area Adjusted <br />Number Classification (Acres) Frontage (Ft) <br />Phase 1 <br />8 E-2 Employment District 24.801 1,343 <br />9 B-2 Business District 9.628 1,261 <br />10 COR 7.507 1,263 <br />Phase 1 Totals <br />41.936 3,867 <br />Phase 2 <br />2 E-2 Employment District 20.252 489 <br />6 R-2 High Density Residential 3.000 353 <br />7 E-2 Employment District 20.307 1,358 <br />Phase 2 Totals <br />43.559 2,200 <br />Phase 3 <br />1 R-2 Medium Density Residential 38.915 1,289 <br />2 E-2 Employment District 28.612 958 <br />3 R-1 MUSA 4.107 419 <br />4 R-1 MUSA 30.508 683 <br />Phase 3 Totals <br />Not Included in Calculations <br />102.141 3,349 <br />5 Public/Quasi-Public 86.422 <br />Totals all Phases 274.064 <br />3,488 <br />12,904 <br />The zoning classifications listed in the table above are based on anticipated future zoning for the study <br />area. Gross areas and frontages are based on GIS information and will most likely be refined during <br />subsequent phases of project development. <br />Several of the parcels were previously assessed for improvements constructed in 2011. The <br />improvements made previously were in direct benefit to parcel 5 to allow for development. Although <br />development did not occur at that time, no further improvements will be required to serve that parcel. <br />Parcel 5 was therefor excluded from calculations that follow. A portion of the improvements will be paid <br />by the City either through utility funds or other means. A list of assumptions is as follows: <br />• All trunk water and sanitary sewer system costs will be paid for through the City utility funds, <br />Prepared by: Bolton & Menk, Inc. COST ALLOCATION ALTERNATIVES <br />City of Ramsey — Future Business Park Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.